4.4.11 - Fault Management Subsystem (FMS)

Tasks

Tasks Sub-Tasks Description References
4.4.11-1 Assess FMS Program Assurance Elements Level 2 Tasks Ensure a set of mission assurance activities exists that is systematically executed through technical assessment of the programmatic practices (cost, schedule, performance, and risk) to ensure the program delivers the required capability within current budget, schedule and political constraints for overall assured mission success. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Program Assurance chapter
4.4.11-2 Assess FMS Risk Identification and Management Level 2 Tasks Ensure that structured process exists to identify and evaluate program or mission risk, including the identification and evaluation of specific risk reduction and risk control measures. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B , Risk Management Chapter
4.4.11-3 Assess FMS Requirements Definition Level 2 Tasks Ensure that a complete and optimal set of requirements is established based on analysis of mission needs, and that a one to one association exists between source and derived requirements (traceability). Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Requirements Analysis and Verification Chapter
4.4.11-4 Assess FMS Design Level 2 Tasks Ensure the sufficiency of the conceptual, preliminary, and the detailed design of the system to perform the intended function through all operating conditions and throughout the design life. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance chapter
4.4.11-5 Assess FMS Verification Planning Level 2 Tasks Ensure plan and process are in place that proves the as-built item complies with the requirements baseline as determined by test, analysis, demonstration, inspection and/or similarity, performed at all levels from the lowest level configuration item to the system. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Requirements Analysis and Verification Chapter
4.4.11-6 Assess FMS Analyses Level 2 Tasks Ensure data evaluation is complete and conducted by accepted analytical techniques to determine that the item will meet specified requirements. TOR-2011(8591)-2, Space Vehicle Test and Evaluation Handbook
4.4.11-7 Assess FMS Manufacturing and Build Level 2 Tasks Ensure manufacturing and build processes produce items that meet the specified requirements and design. Ensure the design is accurately translated into a reliable, durable, manufactured/built item using processes that are highly repeatable and error free. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Manufacturing Assurance chapter
4.4.11-8 Assess FMS Interfaces Level 2 Tasks Ensure all internal and external interfaces are identified and interactions understood (particularly during design and tradeoff analyses). Ensure applicable interface control documents detail compatibility of interfacing systems or components. TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook
4.4.11-9 Assess FMS Integration and Test Planning Level 2 Tasks Ensure process in place whereby components, subassemblies, assemblies, units and subsystems are combined functionally and physically to form and perform as a complete system. Ensure testing verifies requirements and validates unit, subsystem and system performance with sufficient rigor. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B: Integration, Test and Evaluation chapter TOR-2011(8591)-2, Space Vehicle Test and Evaluation Handbook
4.4.11-10 Assess FMS Verification Execution and Results Level 2 Tasks Ensure analysis, simulation, inspection, and test results provide evidence that the as-built system (including all interfaces) satisfies the requirements and specification baseline. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B: Integration, Test and Evaluation chapter TOR-2011(8591)-2, Space Vehicle Test and Evaluation Handbook
4.4.11-11 Assess FMS Operational Readiness Level 2 Tasks Ensure all activities required to transport, receive, accept, store, handle, test, deploy and control the space vehicle and supporting ground systems can be conducted safely and successfully. Includes activation activities - early on orbit testing - to ensure systems are operationally checked out before being released for mission ops. Mission Assurance Guide, TOR-2007(8546)-6018, Rev B: Operations Readiness Chapter