4.5.7 - Hosted Payload

Tasks

Tasks Sub-Tasks Description References
4.5.7-1 Assess Hosted Payload Systems Engineering Level 2 Tasks NA NA
4.5.7-2 Assess Attitude Control Do No Harm Level 2 Tasks NA NA
4.5.7-3 Assess Attitude Control Accommodation Level 2 Tasks NA NA
4.5.7-4 Assess Command and Data Handling Do No Harm Level 2 Tasks NA NA
4.5.7-5 Assess Command and Data Handling Accommodation Level 2 Tasks NA NA
4.5.7-6 Assess Contamination Do No Harm Level 2 Tasks NA NA
4.5.7-7 Assess Integration and Test Accommodation Level 2 Tasks NA NA
4.5.7-8 Assess Structural Dynamics Accommodation Level 2 Tasks NA NA
4.5.7-9 Assess Electrical Design Integration Accommodation Level 2 Tasks NA NA
4.5.7-10 Assess Electrical Interface Design and Integration Do No Harm Level 2 Tasks NA NA
4.5.7-11 Assess Electrical Interface Design and Integration Accommodation Level 2 Tasks NA NA
4.5.7-12 Assess EMI/EMC Do No Harm Level 2 Tasks NA NA
4.5.7-13 Assess EMI/EMC Accommodation Level 2 Tasks NA NA
4.5.7-14 Assess Fault Management Do No Harm Level 2 Tasks NA NA
4.5.7-15 Assess Mechanical Integration and Test Do No Harm Level 2 Tasks NA NA
4.5.7-16 Assess Mechanical Design Integration Accommodation Level 2 Tasks NA NA
4.5.7-17 Assess Operational Accommodation Level 2 Tasks NA NA
4.5.7-18 Assess Optical Do No Harm Level 2 Tasks NA NA
4.5.7-19 Assess Power Do No Harm Level 2 Tasks NA NA
4.5.7-20 Assess Power Accommodation Level 2 Tasks NA NA
4.5.7-21 Assess Safety and Reliability Do No Harm Level 2 Tasks NA NA
4.5.7-22 Assess Structural and Mechanical Do No Harm Level 2 Tasks NA NA
4.5.7-23 Assess Structural and Mechanical Accommodation Level 2 Tasks NA NA
4.5.7-24 Assess Thermal Do No Harm Level 2 Tasks NA NA
4.5.7-25 Assess Thermal Accommodation Level 2 Tasks NA NA