Mission Assurance Baseline v2.10 - Level 1 Tasks

ID Name
1 Mission Area Planning
  1.1 System Planning
    1.1-1.1-1 Assess Enabling Concept, Operating Concept, and Key Performance Parameters
    1.1-1.1-2 Assess Analysis of Alternatives
    1.1-1.1-3 Assess Materiel Solution Analysis
  1.2 Pre-Award Program Planning
    1.2-1.2-1 Assess Affordability
    1.2-1.2-2 Assess Program Cost and Schedule Estimates
    1.2.1 Technical Baseline Development
     1.2.1.1 Program Requirements Planning
        1.2.1.1-1.2.1.1-1 Assess Initial Capabilities Document, Capability Development Document and Capabilities Based Requirements Document
        1.2.1.1-1.2.1.1-2 Assess Threats and Define Categories
        1.2.1.1-1.2.1.1-3 Assess Technology Maturity
        1.2.1.1-1.2.1.1-4 Assess Architectural Views
        1.2.1.1-1.2.1.1-5 Assess Spectrum Availability
        1.2.1.1-1.2.1.1-6 Assess Technical Requirements Document (TRD) Trace to Capability Development Document (CDD)/Initial Capabilities Document (ICD)/Operational Requirements Document (ORD)
        1.2.1.1-1.2.1.1-7 Assess Test & Evaluation Strategy
        1.2.1.1-1.2.1.1-8 Assess Spectrum Planning and Allocation
     1.2.1.2 Program Software Planning
        1.2.1.2-1.2.1.2-1 Assess Government Plans, Activities, and Products
        1.2.1.2-1.2.1.2-2 Assess Government Pre-Contract Award Tasks for Software Mission Assurance
        1.2.1.2-1.2.1.2-3 Assess Pre-Milestone A Contractor Software-Related Plans, Activities, Processes, and Products
        1.2.1.2-1.2.1.2-4 Assess Government Software-Related Plans, Activities, and Products
        1.2.1.2-1.2.1.2-5 Assess Software-Related Independent Analyses
  1.3 Acquisition Planning
    1.3.1 Acquisition Strategy Development
     1.3.1-1.3.1-1 Assess Program Office Infrastructure
     1.3.1-1.3.1-2 Assess Program Risks
     1.3.1-1.3.1-3 Assess Program Risk Mitigation Strategies
     1.3.1-1.3.1-4 Assess Acquisition/Program Strategy
     1.3.1-1.3.1-5 Assess Acquisition Strategy Document against Program Risk Mitigation Strategies
    1.3.2 RFP Development
     1.3.2-1.3.2-1 Assess Request for Proposal (RFP) sub-factors and criteria
     1.3.2-1.3.2-2 Assess Statement of Work, Contract Data Requirements List, Technical Requirements Document, and Work Breakdown Structure against Program Risk Mitigation Strategies
     1.3.2-1.3.2-3 Assess Adequacy of Request for Proposal
2 Program Planning & Systems Engineering
  2.1 Program Management
    2.1.1 Program Assurance
     2.1.1-2.1.1-1 Assess Program Assurance
     2.1.1-2.1.1-2 Assess Adequacy of System Engineering
     2.1.1-2.1.1-3 Assess Government Furnished Equipment Verification Criteria and Responsibilities
     2.1.1-2.1.1-4 Assess Mission Assurance Plan
     2.1.1-2.1.1-5 Assess Program Risk Posture
     2.1.1-2.1.1-6 Assess Technology Maturity and Readiness
     2.1.1-2.1.1-7 Assess Mission Assurance Technical Baseline Assessment for Risk Posture
     2.1.1-2.1.1-8 Assess Mission Assurance Technical Baseline Assessment for Environmental Test Thoroughness Assessment (ETTA)
     2.1.1-2.1.1-9 Assess Mission Assurance Technical Baseline Assessment for Test-Like-You-Fly (TLYF)
     2.1.1-2.1.1-10 Assess Mission Assurance Technical Baseline Assessment for Quality
     2.1.1-2.1.1-11 Assess Mission Assurance Technical Baseline Assessment for Operations Readiness
     2.1.1-2.1.1-12 Assess Mission Assurance Technical Baseline Assessment for Reliability
     2.1.1-2.1.1-13 Assess Mission Assurance Technical Baseline Assessment for Parts, Material and Processes
     2.1.1-2.1.1-14 Assess Mission Assurance Technical Baseline Assessment for Software
     2.1.1-2.1.1-15 Assess Mission Assurance Technical Baseline Assessment for Cyber Security
    2.1.2 Technical Contract Support
     2.1.2-2.1.2-1 Assess Technical Contract Support
    2.1.3 Program Risk Management
     2.1.3-2.1.3-1 Assess Applicable Lessons Learned
     2.1.3-2.1.3-2 Assess Program Risk Management Plan
     2.1.3-2.1.3-3 Assess Risk Management Training
     2.1.3-2.1.3-4 Assess Program Risk Baseline
     2.1.3-2.1.3-5 Assess Program Risk Handling Plans
     2.1.3-2.1.3-6 Assess Pre-Launch Risk Resolution
     2.1.3-2.1.3-7 Assess Operational Risk Items
     2.1.3-2.1.3-8 Assess Operational Lessons Learned
     2.1.3-2.1.3-9 Assess Inclusion of AF Operational Risk Management (ORM) guidelines
    2.1.4 Program Configuration Management/Data Management
     2.1.4-2.1.4-1 Assess Request for Proposal (RFP) Configuration Management (CM) Input
     2.1.4-2.1.4-2 Assess Contractual Implementation of Configuration Management
     2.1.4-2.1.4-3 Assess Functional Configuration Audit Process
     2.1.4-2.1.4-4 Assess Physical Configuration Audit Process
     2.1.4-2.1.4-5 Assess Configuration Identification Process
     2.1.4-2.1.4-6 Assess Configuration Management Implementation
    2.1.5 Program Quality Management
     2.1.5-2.1.5-1 Assess Contract Requirements for Quality Assurance
     2.1.5-2.1.5-2 Assess Contractual Implementation of Quality Assurance Requirements
     2.1.5-2.1.5-3 Assess Quality Management System
     2.1.5-2.1.5-4 Assess Quality Assurance Processes
     2.1.5-2.1.5-5 Assess Quality Control of Suppliers
     2.1.5-2.1.5-6 Assess Specification Flow-Down Process
     2.1.5-2.1.5-7 Assess Subcontractor Design Quality Assurance Processes
     2.1.5-2.1.5-8 Assess Critical Design Review Items
     2.1.5-2.1.5-9 Assess Manufacturing Readiness Review
     2.1.5-2.1.5-10 Assess Test Readiness
     2.1.5-2.1.5-11 Assess Material and Test Nonconformance Control
     2.1.5-2.1.5-12 Assess Production Verification Audits
     2.1.5-2.1.5-13 Assess Test and Integration Activities
     2.1.5-2.1.5-14 Assess Hardware Acceptance Reviews
     2.1.5-2.1.5-15 Assess Build and Sell-Off Quality Assurance Process
     2.1.5-2.1.5-16 Assess Launch Site Quality Plan Assessment
     2.1.5-2.1.5-17 Assess Launch Anomaly or On-Orbit Failure Analysis Review
     2.1.5-2.1.5-18 Assess Technical Adequacy for Hardware Buyoff
     2.1.5-2.1.5-19 Assess Technical Adequacy for Software Buyoff
    2.1.6 Program Software Management
     2.1.6-2.1.6-1 Assess Government Software Plans, Activities, and Products
     2.1.6-2.1.6-2 Assess Government Software Acquisition Management Approach
     2.1.6-2.1.6-3 Assess Contractor Software Plans and Processes
  2.2 Program Systems Engineering
    2.2.1 Requirements Development
     2.2.1-2.2.1-1 Assess Program Requirements Definition and Allocation
     2.2.1-2.2.1-2 Assess System Requirements
     2.2.1-2.2.1-3 Assess Requirement Set Integrity
     2.2.1-2.2.1-4 Assess Requirements Verification and Tracking System
    2.2.2 Design Assurance
     2.2.2-2.2.2-1 Assess and Evaluate Design
     2.2.2-2.2.2-2 Assess Design Planning and Processes
     2.2.2-2.2.2-3 Assess Segment Design
     2.2.2-2.2.2-4 Assess System Design Baseline
     2.2.2-2.2.2-5 Assess Mission Critical Fault Analysis
    2.2.3 Manufacture & Build Assurance
     2.2.3-2.2.3-1 Assess Subcontractor Manufacturing Assurance Processes
     2.2.3-2.2.3-2 Assess Program Manufacturing Management and System Control
     2.2.3-2.2.3-3 Assess Contractor Manufacturing and Production Capability
     2.2.3-2.2.3-4 Assess Manufacturing Processes
    2.2.4 Interfaces
     2.2.4-2.2.4-1 Assess Adequacy of Interface Control Processes
     2.2.4-2.2.4-2 Assess Interface Models, Simulation & Tools
     2.2.4-2.2.4-3 Assess Interface Performance Validation
     2.2.4-2.2.4-4 Assess Interface Requirements
     2.2.4-2.2.4-5 Assess System and Interface Performance
     2.2.4-2.2.4-6 Assess Interface Control Documentation
    2.2.5 Integration & Verification Planning
     2.2.5-2.2.5-1 Assess Test and Evaluation Management
     2.2.5-2.2.5-2 Assess Integration & Verification Requirements
     2.2.5-2.2.5-3 Assess Test and Evaluation Master Plan (TEMP) or Other Test Management Plan
     2.2.5-2.2.5-4 Assess Integration and Verification Risks
     2.2.5-2.2.5-5 Assess Contractor Test Capability
     2.2.5-2.2.5-6 Assess Ground Control and On-Orbit Test Perceptiveness
     2.2.5-2.2.5-7 Assess Test Like You Fly Deviations
     2.2.5-2.2.5-8 Assess Integration and Test Development
     2.2.5-2.2.5-9 Assess Integration, Test and Evaluation as a Gated Process
     2.2.5-2.2.5-10 Assess Test Like You Fly Planning
     2.2.5-2.2.5-11 Assess Adequacy of Integration & Test Plans
    2.2.6 Integration & Verification Execution
     2.2.6-2.2.6-1 Assess Integration & Test Results
    2.2.7 System Transition
     2.2.7.1 System Validation
        2.2.7.1-2.2.7.1-1 Assess System Validation
        2.2.7.1-2.2.7.1-2 Assess System On-Orbit Check Out
     2.2.7.2 Operational Transition
        2.2.7.2-2.2.7.2-1 Assess Physical System and System Support Readiness
        2.2.7.2-2.2.7.2-2 Assess Parallel Readiness Assessment Results
        2.2.7.2-2.2.7.2-3 Assess Deployment Tools, Processes and Procedures
        2.2.7.2-2.2.7.2-4 Assess Personnel and Resources
        2.2.7.2-2.2.7.2-5 Assess Transition Planning
    2.2.8 Reviews & Audits
     2.2.8-2.2.8-1 Assess and Verify Adequacy of Technical Reviews
     2.2.8-2.2.8-2 Assess Government Flight Readiness Review (FRR)
     2.2.8-2.2.8-3 Assess Post Launch Review (PLR)
     2.2.8-2.2.8-4 PLACEHOLDER
     2.2.8-2.2.8-5 Assess Aerospace Readiness Review
     2.2.8-2.2.8-6 Assess Launch Readiness Review
  2.3 Mission Assurance Disciplines
    2.3.1 System Safety
     2.3.1-2.3.1-1 Assess System Safety Contractual Requirements
     2.3.1-2.3.1-2 Assess System Safety Engineering and Management
     2.3.1-2.3.1-3 Assess Hazards Analysis for Adequacy and Completeness
     2.3.1-2.3.1-4 Assess System Safety Integration with Design Engineering
     2.3.1-2.3.1-5 Assess Compliance with Orbital Debris Mitigation Requirements
     2.3.1-2.3.1-6 Assess System Safety Deviations/Waivers
     2.3.1-2.3.1-7 Assess System Engineering Process and Products
     2.3.1-2.3.1-8 Assess Configuration Changes and Deviations/Waivers
     2.3.1-2.3.1-9 Assess Safety Verification Process for Adequacy and Completeness
     2.3.1-2.3.1-10 Assess Explosive Hazard Classification & Characteristics for Adequacy
     2.3.1-2.3.1-11 Assess Explosive Ordnance Disposal Source Data for Adequacy and Completeness
     2.3.1-2.3.1-12 Assess Process for Tracking and Mitigating Hazards
     2.3.1-2.3.1-13 Assess Comprehensive Post Flight Analysis Review Plan for Completeness
     2.3.1-2.3.1-14 Assess Compliance with Safety Requirements
     2.3.1-2.3.1-15 Assess Feedback System Between Program Office and User
     2.3.1-2.3.1-16 Assess System Safety Risk
     2.3.1-2.3.1-17 Assess Integration and Qualification Test Planning
    2.3.2 Reliability Maintainability Availability
     2.3.2-2.3.2-1 Assess Reliability, Maintainability and Availability Contractual Requirements
     2.3.2-2.3.2-2 Assess Reliability Management
     2.3.2-2.3.2-3 Assess Program Design in Relation to Reliability & Availability
     2.3.2-2.3.2-4 Assess Critical/Limited Life Item Control
     2.3.2-2.3.2-5 Assess the Failure Modes, Effects, and Criticality Analysis (FMECA)
     2.3.2-2.3.2-6 Assess Reliability Analysis and Predictions
     2.3.2-2.3.2-7 Assess Reliability Testing and Analysis
     2.3.2-2.3.2-8 Assess Program Reliability & Availability Verification
     2.3.2-2.3.2-9 Assess Environmental Stress Screening (ESS) Verification
     2.3.2-2.3.2-10 Assess Failure Analysis and Correction Action Boards
     2.3.2-2.3.2-11 Assess Operational Readiness
     2.3.2-2.3.2-12 Assess Launch/On-Orbit Anomaly Resolution
    2.3.3 Parts Materials & Processes (PM&P)
     2.3.3-2.3.3-1 Assess Request For Proposal (RFP) Program Parts, Material, and Processes (PM&P) Management Requirements
     2.3.3-2.3.3-2 Assess Parts, Material, and Processes (PM&P) Management Requirements and Control Program Plan
     2.3.3-2.3.3-3 Assess Program Approved Parts, Material, and Processes List
     2.3.3-2.3.3-4 Assess Parts, Material, and Processes Products/Implementation
     2.3.3-2.3.3-5 Assess Parts, Material, and Processes Anomaly Resolution
     2.3.3-2.3.3-6 Assess Fabrication and Integration Parts, Material, and Processes (PM&P) Process
     2.3.3-2.3.3-7 PLACEHOLDER
     2.3.3-2.3.3-8 Assess Impact of Problem Alert Systems on Program PM&P
     2.3.3-2.3.3-9 Assess Parts at Risk for Obsolescence
    2.3.4 Electrical Design Integration
     2.3.4-2.3.4-1 Assess EDI Requirements Definition
     2.3.4-2.3.4-2 Assess EDI Design
     2.3.4-2.3.4-3 Assess EDI Analyses
     2.3.4-2.3.4-4 Assess EDI Verification Execution and Results
    2.3.5 Mechanical Design Integration
     2.3.5-2.3.5-1 Assess Mechanical Design Integration Requirements
     2.3.5-2.3.5-2 Assess Mechanical Design Integration Implementation
     2.3.5-2.3.5-3 Assess Mechanical Design Integration Analysis
     2.3.5-2.3.5-4 Assess Mechanical Design Integration Manufacture and Build
    2.3.6 Electromagnetic Interference/Electromagnetic Compatibility (EMI/EMC)
     2.3.6-2.3.6-1 Assess EMI/EMC Systems Engineering
     2.3.6-2.3.6-2 Assess EMI/EMC Requirements
     2.3.6-2.3.6-3 Assess EMI/EMC Design
     2.3.6-2.3.6-4 Assess EMI/EMC Testing
    2.3.7 Mass Properties
     2.3.7-2.3.7-1 Assess Mass Properties Control
     2.3.7-2.3.7-2 Assess Mass Properties Analysis
     2.3.7-2.3.7-3 Assess Mass Properties Verification
     2.3.7-2.3.7-4 Assess Mass Properties Data Management
     2.3.7-2.3.7-5 Assess Mass Properties Documentation
    2.3.8 Contamination Control
     2.3.8-2.3.8-1 Assess Contamination Control Requirement Analysis and Verification
     2.3.8-2.3.8-2 Assess Design Assurance and Contamination Control
     2.3.8-2.3.8-3 Assess Manufacturing Assurance and Contamination Control
     2.3.8-2.3.8-4 Assess Quality Assurance and Contamination Control
     2.3.8-2.3.8-5 Assess Test & Integration and Contamination Control
    2.3.9 System Survivability
     2.3.9-2.3.9-1 Assess Request for Proposal and Contract Requirements for Survivability
     2.3.9-2.3.9-2 Assess Survivability Requirements
     2.3.9-2.3.9-3 Assess Survivability Planning
     2.3.9-2.3.9-4 Assess Survivability System Engineering
     2.3.9-2.3.9-5 Assess Survivability Design
     2.3.9-2.3.9-6 Assess Survivability Analyses
     2.3.9-2.3.9-7 Assess Survivability Testing
     2.3.9-2.3.9-8 Assess Production Support for Survivability
    2.3.10 Supportability (Logistics)
     2.3.10-2.3.10-1 Assess Packaging, Handling, Storage, and Transportability
     2.3.10-2.3.10-2 Assess Logistics Support Analyses
    2.3.11 Software Engineering
     2.3.11-2.3.11-1 Assess Software Program Assurance
     2.3.11-2.3.11-2 Assess Software Risk Identification and Management
     2.3.11-2.3.11-3 Assess Contractor Software-Related Plans and Processes
     2.3.11-2.3.11-4 Assess Software Plans and Processes
     2.3.11-2.3.11-5 Assess Software Integration and Qualification Test Planning
    2.3.12 Cyber Security
     2.3.12-2.3.12-1 Assess System Categorization
     2.3.12-2.3.12-2 Assess Cybersecurity Control Selection
     2.3.12-2.3.12-3 Assess Cybersecurity Requirements
     2.3.12-2.3.12-4 Assess Cybersecurity Architecture
     2.3.12-2.3.12-5 Assess Cybersecurity Design
     2.3.12-2.3.12-6 Assess Cyber Application Security
     2.3.12-2.3.12-7 Assess Cyber Operating System Security
     2.3.12-2.3.12-8 Assess Cyber Network Security
     2.3.12-2.3.12-9 Assess Cybersecurity Implementation and Unit Testing
     2.3.12-2.3.12-10 Assess Cybersecurity Cryptographic Product Acquisition
     2.3.12-2.3.12-11 Assess Cybersecurity Key Management Process
     2.3.12-2.3.12-12 Assess Cybersecurity Verification Test Planning
     2.3.12-2.3.12-13 Assess Cybersecurity Verification
     2.3.12-2.3.12-14 Assess Cybersecurity System Authorization Activities
     2.3.12-2.3.12-15 Assess Program Protection Planning
     2.3.12-2.3.12-16 Assess Criticality Analysis Process and CPI and CC Identification Process
     2.3.12-2.3.12-17 Assess Threat and Vulnerability Analysis
     2.3.12-2.3.12-18 Assess Counter Measure Analysis Process
     2.3.12-2.3.12-19 Assess Program Protection Risk Analysis
     2.3.12-2.3.12-20 Assess Analysis of Foreign Involvement with Program
     2.3.12-2.3.12-21 Assess Program Protection Execution
    2.3.13 Frequency Management
     2.3.13-2.3.13-1 Assess Spectrum Management Plan and Supporting Processes
     2.3.13-2.3.13-2 Assess Spectrum Support Strategies
     2.3.13-2.3.13-3 Assess Spectrum Compliance Activities
     2.3.13-2.3.13-4 Assess Spectrum Registration Requirements
    2.3.14 Human Factors Engineering
     2.3.14-2.3.14-1 Assess Human System Integration Requirements
     2.3.14-2.3.14-2 Assess Human System Integration with Operation Concepts
     2.3.14-2.3.14-3 Assess Human System Integration System Analysis
     2.3.14-2.3.14-4 Assess Human System Integration Manpower
     2.3.14-2.3.14-5 Assess Human System Integration Habitability
     2.3.14-2.3.14-6 Assess Human System Integration System Safety
     2.3.14-2.3.14-7 Assess Human System Integration Occupational Health
     2.3.14-2.3.14-8 Assess Human System Integration Human Survivability
     2.3.14-2.3.14-9 Assess Human System Integration Training
     2.3.14-2.3.14-10 Assess Human System Integration Human Factors Engineering
     2.3.14-2.3.14-11 Assess Human System Integration Maintainability
     2.3.14-2.3.14-12 Assess Human System Integration Manufacturing Environment
     2.3.14-2.3.14-13 Assess Human System Integration Test Planning
     2.3.14-2.3.14-14 Assess Human System Integration Testing
    2.3.15 Environmental, Safety, and Health
     2.3.15-2.3.15-1 Assess Environmental, Safety, and Health Requirements, Processes, and Activities
    2.3.16 Cables and Harnesses
     2.3.16-2.3.16-1 Assess Cable and Harness Assurance Elements
     2.3.16-2.3.16-2 Assess Cable and Harness Risk Identification and Management
     2.3.16-2.3.16-3 Assess Cable and Harness Requirements Definition
     2.3.16-2.3.16-4 Assess Cable and Harness Design
     2.3.16-2.3.16-5 Assess Cable and Harness Verification Planning
     2.3.16-2.3.16-6 Assess Cable and Harness Analyses
     2.3.16-2.3.16-7 Assess Cable and Harness Manufacturing and Build
     2.3.16-2.3.16-8 Assess Cable and Harness Interfaces
     2.3.16-2.3.16-9 Assess Cable and Harness Integration and Test Plan
     2.3.16-2.3.16-10 Assess Cable and Harness Verification Execution and Results
     2.3.16-2.3.16-11 Assess Cable and Harness Operational Readiness
    2.3.17 Dead Bus Recovery
     2.3.17-2.3.17-1 Assess Dead Bus Recovery Requirements
     2.3.17-2.3.17-2 Assess Dead Bus Recovery Design and Capabilities
     2.3.17-2.3.17-3 Assess Dead Bus Recovery Limitations and Risks
     2.3.17-2.3.17-4 Assess Dead Bus Recovery Operation Constraints
     2.3.17-2.3.17-5 Assess Dead Bus Recovery Capability Verification Planning
     2.3.17-2.3.17-6 Assess Dead Bus Recovery Capability Verification Execution and Results
     2.3.17-2.3.17-7 Assess Dead Bus Recovery Operations
3 Launch Preparation & Integration
  3.1 Launch Site Integration
    3.1-3.1-1 Assess System Interface Compliance
    3.1-3.1-2 Assess Contractor Maintenance Processes & Data
    3.1-3.1-3 Assess Critical System Modifications & Engineering Change Requests
    3.1-3.1-4 Assess Critical Repair and Replace Actions
    3.1-3.1-5 Assess Contractor Cause & Corrective Action Efforts/Anomalies
    3.1-3.1-6 Assess Base Infrastructure
    3.1-3.1-7 Assess RF Emitter Risks and Controls
    3.1-3.1-8 Assess AFSCN Compatibility Testing
    3.1-3.1-9 Assess Over flight Risk
    3.1-3.1-10 Assess Program Requirement Document (PRD) Compliance
    3.1-3.1-11 Assess SV Transportation Systems Maintenance
    3.1-3.1-12 Assess SV Transportation Systems Modifications & Engineering Change Requests
    3.1-3.1-13 Assess SV Transportation Systems Interface/Capability Compliance
    3.1-3.1-14 Assess SV Transportation Systems Operational Planning
    3.1-3.1-15 Assess SV Transportation Systems Cause & Corrective Action/Anomalies
    3.1-3.1-16 Assess SV Fueling Systems Maintenance
    3.1-3.1-17 Assess SV Fueling Systems Modifications & Engineering Change Requests
    3.1-3.1-18 Assess SV Fueling Systems Interface/Capability Compliance
    3.1-3.1-19 Assess SV Fueling Systems Operational Planning
    3.1-3.1-20 Assess SV Fueling Systems Cause & Corrective Action/Anomalies
    3.1-3.1-21 Assess Plans/Procedures & Schedules to support SV processing
    3.1-3.1-22 Assess Lessons Learned for SV processing
    3.1-3.1-23 Assess Critical Operations, Tests and Anomalies for SV processing
    3.1-3.1-24 Assess On-console Rehearsal & Launch Support
    3.1-3.1-25 Assess Payload Safety
    3.1-3.1-26 Assess Structural and Mechanical Interfaces
    3.1-3.1-27 Assess Electrical Interfaces
    3.1-3.1-28 Assess Spacecraft Environments
    3.1-3.1-29 Assess Dynamics
    3.1-3.1-30 Assess EMC/EMI
    3.1-3.1-31 Assess Mission Design
    3.1-3.1-32 Assess Ground Operations
    3.1-3.1-33 Assess Safety
    3.1-3.1-34 Assess System Engineering Readiness and Mission Technical Risk
    3.1-3.1-35 Assess Adequacy of Mission Analyses and Flight Software through IV&V
    3.1-3.1-36 Assess Mission Readiness
4 Space Segment
  4.2 Space Segment Systems Engineering
    4.2-4.2-1 Assess Space Segment Program Assurance Elements
    4.2-4.2-2 Assess Space Segment Risk Identification and Management
    4.2-4.2-3 Assess Space Segment Requirements Definition and Allocation
    4.2-4.2-4 Assess Space Segment Design
    4.2-4.2-5 Assess Space Segment Verification Planning
    4.2-4.2-6 Assess Space Segment Analysis
    4.2-4.2-7 Assess Space Segment Manufacturing and Build
    4.2-4.2-8 Assess Space Segment Interfaces
    4.2-4.2-9 Assess Space Segment Integration and Test Planning
    4.2-4.2-10 Assess Space Segment Verification Execution and Results
    4.2-4.2-11 Assess Space Segment Operational Readiness
  4.4 Spacecraft Bus Element
    4.4.2 Bus Element Systems Engineering
     4.4.2-4.4.2-1 Assess Bus System Program Assurance Elements
     4.4.2-4.4.2-2 Assess Bus System Risk Identification and Management
     4.4.2-4.4.2-3 Assess Bus System Requirements Definition and Allocation
     4.4.2-4.4.2-4 Assess Bus System Design
     4.4.2-4.4.2-5 Assess Bus System Verification Planning
     4.4.2-4.4.2-6 Assess Bus System Analysis
     4.4.2-4.4.2-7 Assess Bus System Manufacturing and Build
     4.4.2-4.4.2-8 Assess Bus System Interfaces
     4.4.2-4.4.2-9 Assess Bus System Integration and Test Planning
     4.4.2-4.4.2-10 Assess Bus System Verification Execution and Results
     4.4.2-4.4.2-11 Assess Bus System Operational Readiness
    4.4.4 Structures & Mechanisms Subsystem (SMS)
     4.4.4-4.4.4-1 Assess SMS Program Assurance Elements
     4.4.4-4.4.4-2 Assess SMS Risk Identification and Management
     4.4.4-4.4.4-3 Assess SMS Requirements Definition
     4.4.4-4.4.4-4 Assess SMS Design
     4.4.4-4.4.4-5 Assess SMS Verification Planning
     4.4.4-4.4.4-6 Assess SMS Analyses
     4.4.4-4.4.4-7 Assess SMS Manufacturing and Build
     4.4.4-4.4.4-8 Assess SMS Interfaces
     4.4.4-4.4.4-9 Assess SMS Integration and Test Planning
     4.4.4-4.4.4-10 Assess SMS Verification Execution and Results
     4.4.4-4.4.4-11 Assess SMS Operational Readiness
     4.4.4.4 Structures
        4.4.4.4-4.4.4.4-4 Assess Structures Design
        4.4.4.4-4.4.4.4-5 Assess Structures Verification Planning
        4.4.4.4-4.4.4.4-6 Assess Structures Analysis
        4.4.4.4-4.4.4.4-7 Assess Structures Manufacturing and Build
        4.4.4.4-4.4.4.4-10 Assess Structures Verification Execution and Results
     4.4.4.5 Mechanisms & Deployables
        4.4.4.5-4.4.4.5-4 Assess Mechanisms & Deployables Design
        4.4.4.5-4.4.4.5-5 Assess Mechanisms & Deployables Verification Planning
        4.4.4.5-4.4.4.5-6 Assess Mechanisms & Deployables Analyses
        4.4.4.5-4.4.4.5-10 Assess Mechanisms & Deployables Verification Execution and Results
        4.4.4.5-4.4.4.5-11 Assess Mechanisms & Deployables Operational Readiness
     4.4.4.6 Structural Dynamics
        4.4.4.6-4.4.4.6-4 Assess Structural Dynamics Design
        4.4.4.6-4.4.4.6-5 Assess Structural Dynamics Verification Planning
        4.4.4.6-4.4.4.6-6 Assess Structural Dynamics Analyses
     4.4.4.7 Ordnance/Pyrotechnics
        4.4.4.7-4.4.4.7-3 Assess Ordnance/Pyrotechnics Requirements Definition
        4.4.4.7-4.4.4.7-4 Assess Ordnance/Pyrotechnic Design
        4.4.4.7-4.4.4.7-5 Assess Ordnance/Pyrotechnics Verification Planning
        4.4.4.7-4.4.4.7-6 Assess Ordnance/Pyrotechnics Analyses
        4.4.4.7-4.4.4.7-7 Assess Ordnance/Pyrotechnics Manufacturing and Build
        4.4.4.7-4.4.4.7-8 Assess Ordnance/Pyrotechnics Interfaces
        4.4.4.7-4.4.4.7-9 Assess Ordnance/Pyrotechnics Integration and Test Planning
        4.4.4.7-4.4.4.7-10 Assess Ordnance/Pyrotechnics Verification Execution and Results
    4.4.5 Electrical Power & Distribution Subsystem (EPDS)
     4.4.5-4.4.5-1 Assess EPDS Program Assurance Elements
     4.4.5-4.4.5-2 Assess EPDS Risk Identification and Management
     4.4.5-4.4.5-3 Assess EPDS Requirements Definition
     4.4.5-4.4.5-4 Assess EPDS Design
     4.4.5-4.4.5-5 Assess EPDS Verification Planning
     4.4.5-4.4.5-6 Assess EPDS Analyses
     4.4.5-4.4.5-7 Assess EPDS Manufacturing and Build
     4.4.5-4.4.5-8 Assess EPDS Interfaces
     4.4.5-4.4.5-9 Assess EPDS Integration and Test Planning
     4.4.5-4.4.5-10 Assess EPDS Verification Execution and Results
     4.4.5-4.4.5-11 Assess EPDS Operational Readiness
    4.4.6 Thermal Control Subsystem (TCS)
     4.4.6-4.4.6-1 Assess TCS Program Assurance Elements
     4.4.6-4.4.6-2 Assess TCS Risk Identification and Management
     4.4.6-4.4.6-3 Assess TCS Requirements Definition
     4.4.6-4.4.6-4 Assess TCS Design
     4.4.6-4.4.6-5 Assess TCS Verification Planning
     4.4.6-4.4.6-6 Assess TCS Analyses
     4.4.6-4.4.6-7 Assess TCS Manufacturing and Build
     4.4.6-4.4.6-8 Assess TCS Interfaces
     4.4.6-4.4.6-9 Assess TCS Integration and Test Planning
     4.4.6-4.4.6-10 Assess TCS Verification Execution and Results
     4.4.6-4.4.6-11 Assess TCS Operational Readiness
    4.4.7 Attitude Control Subsystem (ACS)
     4.4.7-4.4.7-1 Assess ACS Program Assurance Elements
     4.4.7-4.4.7-2 Assess ACS Risk Identification and Management
     4.4.7-4.4.7-3 Assess ACS Requirements Definition
     4.4.7-4.4.7-4 Assess ACS Design
     4.4.7-4.4.7-5 Assess ACS Verification Planning
     4.4.7-4.4.7-6 Assess ACS Analyses
     4.4.7-4.4.7-7 Assess ACS Manufacturing and Build
     4.4.7-4.4.7-8 Assess ACS Interfaces
     4.4.7-4.4.7-9 Assess ACS Integration and Test Planning
     4.4.7-4.4.7-10 Assess ACS Verification Execution and Results
     4.4.7-4.4.7-11 Assess ACS Operational Readiness
    4.4.8 Propulsion Subsystem (PS)
     4.4.8-4.4.8-1 Assess Propulsion Program Assurance Elements
     4.4.8-4.4.8-2 Assess Propulsion Risk Identification and Management
     4.4.8-4.4.8-3 Assess Propulsion Requirements Definition
     4.4.8-4.4.8-4 Assess Propulsion Design
     4.4.8-4.4.8-5 Assess Propulsion Verification Planning
     4.4.8-4.4.8-6 Assess Propulsion Analyses
     4.4.8-4.4.8-7 Assess Propulsion Manufacturing and Build
     4.4.8-4.4.8-8 Assess Propulsion Interfaces
     4.4.8-4.4.8-9 Assess Propulsion Integration and Test Planning
     4.4.8-4.4.8-10 Assess Propulsion Verification Execution and Results
     4.4.8-4.4.8-11 Assess Propulsion Operational Readiness
    4.4.9 Telemetry Tracking & Command Subsystem (TT&C)
     4.4.9-4.4.9-1 Assess TT&C Program Assurance Elements
     4.4.9-4.4.9-2 Assess TT&C Risk Identification and Management
     4.4.9-4.4.9-3 Assess TT&C Requirements Definition
     4.4.9-4.4.9-4 Assess TT&C Design
     4.4.9-4.4.9-5 Assess TT&C Verification Planning
     4.4.9-4.4.9-6 Assess TT&C Analyses
     4.4.9-4.4.9-7 Assess TT&C Manufacturing and Build
     4.4.9-4.4.9-8 Assess TT&C Interfaces
     4.4.9-4.4.9-9 Assess TT&C Integration and Test Planning
     4.4.9-4.4.9-10 Assess TT&C Verification Execution and Results
     4.4.9-4.4.9-11 Assess TT&C Operational Readiness
     4.4.9-4.4.9-12 Assess Spectrum Planning and Allocation
    4.4.10 Command & Data Handling Subsystem (C&DH)
     4.4.10-4.4.10-1 Assess C&DH Program Assurance Elements
     4.4.10-4.4.10-2 Assess C&DH Risk Identification and Management
     4.4.10-4.4.10-3 Assess C&DH Requirements Definition
     4.4.10-4.4.10-4 Assess C&DH Design
     4.4.10-4.4.10-5 Assess C&DH Verification Planning
     4.4.10-4.4.10-6 Assess C&DH Analyses
     4.4.10-4.4.10-7 Assess C&DH Manufacturing and Build
     4.4.10-4.4.10-8 Assess C&DH Interfaces
     4.4.10-4.4.10-9 Assess C&DH Integration and Test Planning
     4.4.10-4.4.10-10 Assess C&DH Verification Execution and Results
     4.4.10-4.4.10-11 Assess C&DH Operational Readiness
    4.4.11 Fault Management Subsystem (FMS)
     4.4.11-4.4.11-1 Assess FMS Program Assurance Elements
     4.4.11-4.4.11-2 Assess FMS Risk Identification and Management
     4.4.11-4.4.11-3 Assess FMS Requirements Definition
     4.4.11-4.4.11-4 Assess FMS Design
     4.4.11-4.4.11-5 Assess FMS Verification Planning
     4.4.11-4.4.11-6 Assess FMS Analyses
     4.4.11-4.4.11-7 Assess FMS Manufacturing and Build
     4.4.11-4.4.11-8 Assess FMS Interfaces
     4.4.11-4.4.11-9 Assess FMS Integration and Test Planning
     4.4.11-4.4.11-10 Assess FMS Verification Execution and Results
     4.4.11-4.4.11-11 Assess FMS Operational Readiness
    4.4.12 Software Subsystem (SS)
     4.4.12-4.4.12-1 Assess Software-Related Independent Analyses
     4.4.12-4.4.12-2 Assess Contractor Software-Related Processes
     4.4.12-4.4.12-3 Assess Contractor Software-Related Development Products
     4.4.12-4.4.12-4 Assess Contractor Software-Related Plans
     4.4.12-4.4.12-5 Assess Software Subsystem Test and Installation Activities
     4.4.12-4.4.12-6 Assess Software Subsystem Verification and Execution
  4.5 Payload Element
    4.5.2 Payload Element Systems Engineering
     4.5.2-4.5.2-1 Assess Payload Program Assurance Elements
     4.5.2-4.5.2-2 Assess Payload Risk Identification and Management
     4.5.2-4.5.2-3 Assess Payload Requirements Definition and Allocation
     4.5.2-4.5.2-4 Assess Payload Design
     4.5.2-4.5.2-5 Assess Payload Verification Planning
     4.5.2-4.5.2-6 Assess Payload Analysis
     4.5.2-4.5.2-7 Assess Payload Manufacturing and Build
     4.5.2-4.5.2-8 Assess Payload Interfaces
     4.5.2-4.5.2-9 Assess Payload Integration and Test Planning
     4.5.2-4.5.2-10 Assess Payload Verification Execution and Results
     4.5.2-4.5.2-11 Assess Payload Operational Readiness
     4.5.2-4.5.2-12 Assess Spectrum Planning and Allocation
    4.5.4 Communications
     4.5.4-4.5.4-1 Assess Communications Payload Program Assurance Elements
     4.5.4-4.5.4-2 Assess Communications Payload Risk Identification and Management
     4.5.4-4.5.4-3 Assess Communications Payload Requirements Definition
     4.5.4-4.5.4-4 Assess Communications Payload Design
     4.5.4-4.5.4-5 Assess Communications Payload Verification Planning
     4.5.4-4.5.4-6 Assess Communications Payload Analyses
     4.5.4-4.5.4-7 Assess Communications Payload Manufacturing and Build
     4.5.4-4.5.4-8 Assess Communications Payload Interfaces
     4.5.4-4.5.4-9 Assess Communications Payload Integration and Test Planning
     4.5.4-4.5.4-10 Assess Communications Payload Verification Execution and Results
     4.5.4-4.5.4-11 Assess Communications Payload Operational Readiness
     4.5.4-4.5.4-12 Assess Communications Payload Operations and Sustainment
     4.5.4-4.5.4-13 Assess Frequency Planning and Allocation
    4.5.5 Optical
     4.5.5-4.5.5-1 Assess Optical Payload Program Assurance Elements
     4.5.5-4.5.5-2 Assess Optical Payload Risk Identification and Management
     4.5.5-4.5.5-3 Assess Optical Payload Requirements Definition
     4.5.5-4.5.5-4 Assess Optical Payload Design
     4.5.5-4.5.5-5 Assess Optical Payload Verification Planning
     4.5.5-4.5.5-6 Assess Optical Payload Analyses
     4.5.5-4.5.5-7 Assess Optical Payload Manufacturing and Build
     4.5.5-4.5.5-8 Assess Optical Payload Interfaces
     4.5.5-4.5.5-9 Assess Optical Payload Integration and Test Planning
     4.5.5-4.5.5-10 Assess Optical Payload Verification Execution and Results
     4.5.5-4.5.5-11 Assess Optical Payload Operational Readiness
     4.5.5-4.5.5-12 Assess Optical Payload Operations and Sustainment
    4.5.6 Navigation
     4.5.6-4.5.6-1 Assess Navigation Payload Program Assurance Elements
     4.5.6-4.5.6-2 Assess Navigation Payload Risk Identification and Management
     4.5.6-4.5.6-3 Assess Navigation Payload Requirements Definition
     4.5.6-4.5.6-4 Assess Navigation Payload Design
     4.5.6-4.5.6-5 Assess Navigation Payload Verification Planning
     4.5.6-4.5.6-6 Assess Navigation Payload Analysis
     4.5.6-4.5.6-7 Assess Navigation Payload Manufacturing and Build
     4.5.6-4.5.6-8 Assess Navigation Payload Interfaces
     4.5.6-4.5.6-9 Assess Navigation Payload Integration and Test Planning
     4.5.6-4.5.6-10 Assess Navigation Payload Verification Execution and Results
     4.5.6-4.5.6-11 Assess Navigation Payload Operational Readiness
     4.5.6-4.5.6-12 Assess Navigation Payload Operations and Sustainment
     4.5.6-4.5.6-13 Assess Navigation Payload Frequency Planning and Allocation
    4.5.7 Hosted Payload
     4.5.7-4.5.7-1 Assess Hosted Payload Systems Engineering
     4.5.7-4.5.7-2 Assess Attitude Control Do No Harm
     4.5.7-4.5.7-3 Assess Attitude Control Accommodation
     4.5.7-4.5.7-4 Assess Command and Data Handling Do No Harm
     4.5.7-4.5.7-5 Assess Command and Data Handling Accommodation
     4.5.7-4.5.7-6 Assess Contamination Do No Harm
     4.5.7-4.5.7-7 Assess Integration and Test Accommodation
     4.5.7-4.5.7-8 Assess Structural Dynamics Accommodation
     4.5.7-4.5.7-9 Assess Electrical Design Integration Accommodation
     4.5.7-4.5.7-10 Assess Electrical Interface Design and Integration Do No Harm
     4.5.7-4.5.7-11 Assess Electrical Interface Design and Integration Accommodation
     4.5.7-4.5.7-12 Assess EMI/EMC Do No Harm
     4.5.7-4.5.7-13 Assess EMI/EMC Accommodation
     4.5.7-4.5.7-14 Assess Fault Management Do No Harm
     4.5.7-4.5.7-15 Assess Mechanical Integration and Test Do No Harm
     4.5.7-4.5.7-16 Assess Mechanical Design Integration Accommodation
     4.5.7-4.5.7-17 Assess Operational Accommodation
     4.5.7-4.5.7-18 Assess Optical Do No Harm
     4.5.7-4.5.7-19 Assess Power Do No Harm
     4.5.7-4.5.7-20 Assess Power Accommodation
     4.5.7-4.5.7-21 Assess Safety and Reliability Do No Harm
     4.5.7-4.5.7-22 Assess Structural and Mechanical Do No Harm
     4.5.7-4.5.7-23 Assess Structural and Mechanical Accommodation
     4.5.7-4.5.7-24 Assess Thermal Do No Harm
     4.5.7-4.5.7-25 Assess Thermal Accommodation
  4.6 Space Vehicle Ground Support Equipment
    4.6-4.6-1 Assess Space Vehicle Ground Support Equipment Requirements Definition
    4.6-4.6-2 Assess Space Vehicle Ground Support Equipment Design
    4.6-4.6-3 Assess Space Vehicle Ground Support Equipment Verification Planning
    4.6-4.6-4 Assess Space Vehicle Ground Support Equipment Analyses
    4.6-4.6-5 Assess Space Vehicle Ground Support Equipment Manufacturing and Build
    4.6-4.6-6 Assess Space Vehicle Ground Support Equipment Interfaces
    4.6-4.6-7 Assess Space Vehicle Ground Support Equipment Integration and Test Planning
    4.6-4.6-8 Assess Space Vehicle Ground Support Equipment Verification Execution and Results
    4.6-4.6-9 Assess Space Vehicle Ground Support Equipment Operational Readiness
  4.7 Space Operations
    4.7-4.7-1 Assess Segment Operational Requirements
    4.7-4.7-2 Assess Space Segment Operational Procedures
  4.8 Launch System Integration
    4.8-4.8-1 Assess LSI Risk Identification and Management
    4.8-4.8-2 Assess LSI Requirements Definition
    4.8-4.8-3 Assess LSI Planning
    4.8-4.8-4 Assess LSI Design and Analysis
    4.8-4.8-5 Assess LSI Verification
    4.8-4.8-6 Assess Launch Base Operational Readiness and Execution
  4.9 Space Vehicle Storage
    4.9-4.9-1 Assess Space Vehicle Storage Requirements
    4.9-4.9-2 Assess Space Vehicle Storage Planning
    4.9-4.9-3 Assess Space Vehicle Storage Analyses
    4.9-4.9-4 Assess Space Vehicle Removal and Testing
5 Ground Segment
  5.1 Ground Segment Program Planning & Management
    5.1-5.1-1 Assess Ground Segment Program Assurance
  5.2 Ground Segment System Engineering, Integration & Test (SEIT)
    5.2-5.2-2 Assess Ground Segment Risk Identification and Management
    5.2-5.2-3 Assess Ground Segment Requirements Definition
    5.2-5.2-4 Assess Ground Segment Design
    5.2-5.2-5 Assess Ground Segment Architecture
    5.2-5.2-6 Assess Ground Segment Analysis
    5.2-5.2-7 Assess Ground Segment Integration and Qualification Test Planning
    5.2-5.2-8 Assess Ground Segment Integration and Qualification Testing
    5.2.2 Ground Segment Supportability
     5.2.2-5.2.2-1 Assess Ground Segment Supportability Program Assurance
     5.2.2-5.2.2-2 Assess Ground Segment Supportability Risk Identification and Management
     5.2.2-5.2.2-3 Assess Ground Segment Supportability Requirements
     5.2.2-5.2.2-4 Assess Ground Segment Supportability Analysis
     5.2.2-5.2.2-5 Assess Ground Segment Supportability Design
  5.4 Ground Segment Software
    5.4-5.4-1 Assess Ground Segment Software Requirements
    5.4-5.4-2 Assess Ground Segment Software Architecture
    5.4-5.4-3 Assess Ground Segment Software Design
    5.4-5.4-4 Assess Ground Segment Software Analysis
    5.4-5.4-5 Assess Ground Segment Software Implementation and Unit Test
    5.4-5.4-6 Assess Ground Segment Software Integration and Qualification Testing
  5.5 Ground Segment Hardware
    5.5-5.5-1 Assess Ground Segment Hardware Requirements
    5.5-5.5-2 Assess Ground Segment Hardware Architecture
    5.5-5.5-3 Assess Ground Segment Hardware Design
    5.5-5.5-4 Assess Ground Segment Hardware Analysis
    5.5-5.5-5 Assess Ground Segment Manufacturing and Build
    5.5-5.5-6 Assess Ground Segment Hardware Integration and Test Planning
    5.5-5.5-7 Assess Ground Segment Integration, Test and Evaluation
  5.6 Ground Segment Facilities
    5.6-5.6-1 Assess Ground Segment Facilities Requirements
    5.6-5.6-2 Assess Ground Segment Facilities Architecture
    5.6-5.6-3 Assess Ground Segment Facilities Design
    5.6-5.6-4 Assess Ground Segment Facilities Analysis
    5.6-5.6-5 Assess Ground Segment Facilities Integration and Test Planning
    5.6-5.6-6 Assess Ground Segment Facilities Integration and Test
6 Launch Segment (Future Work)
7 User Segment
  7.1 User Segment Program Planning & Management
    7.1-7.1-1 Assess Spectrum Planning and Allocation
  7.2 User Segment Systems Engineering
  7.3 User Segment Integration & Test
8 Operations
  8-1 Assess Impacts of Operational Concepts and Implementation
  8-2 Assess Requirements in Terms of Operational Implementation
  8-3 Assess Security Requirements for Operational Implementation
  8-4 Assess Simulation Effectiveness and Certification
  8-5 Assess Operational Involvement in Flight/Ground Software Integration and Test
  8-6 Assess Site Activation and Transition Plans
  8-7 Assess Operations Schedule Integration and Executability
  8-8 Assess Communications Operations Readiness
  8-9 Assess Factory Tests and Reviews for Potential Operational Impacts
  8-10 Assess Operational Evaluation of Factory Support and Preparedness
  8-11 Assess Facility/Hardware/Software Maintenance Processes
  8-12 Assess Operations Configuration Control
  8-13 Assess System Functionality of Operational Sites
  8-14 Assess Operations Rehearsal Preparation and Execution
  8-15 Assess Operations Staffing and Training Preparedness
  8-16 Assess Operations Products
  8-17 Assess System Operability
  8-18 Assess System Reliability, Maintainability, and Availability During Operations
  8-19 Assess Operations Performance
  8-20 Assess On-Orbit Operations
  8-21 Assess Monitoring of Cybersecurity Controls in Operations
  8-22 Assess Monitoring of Application Security in Operations
  8-23 Assess Monitoring of Cyber Operating System Security in Operations
  8-24 Assess Monitoring of Cyber Network Security in Operations
  8-25 Assess Updates to Security Authorization Package