1 |
Mission Area Planning |
|
1.1 |
System Planning |
| | |
1.1-1.1-1 |
Assess Enabling Concept, Operating Concept, and Key Performance Parameters |
| | |
1.1-1.1-2 |
Assess Analysis of Alternatives |
| | |
1.1-1.1-3 |
Assess Materiel Solution Analysis |
|
1.2 |
Pre-Award Program Planning |
| | |
1.2-1.2-1 |
Assess Affordability |
| | |
1.2-1.2-2 |
Assess Program Cost and Schedule Estimates |
| | |
1.2.1 |
Technical Baseline Development |
| | | |
1.2.1.1 |
Program Requirements Planning |
| | |
|
|
1.2.1.1-1.2.1.1-1 |
Assess Initial Capabilities Document, Capability Development Document and Capabilities Based Requirements Document |
| | |
|
|
1.2.1.1-1.2.1.1-2 |
Assess Threats and Define Categories |
| | |
|
|
1.2.1.1-1.2.1.1-3 |
Assess Technology Maturity |
| | |
|
|
1.2.1.1-1.2.1.1-4 |
Assess Architectural Views |
| | |
|
|
1.2.1.1-1.2.1.1-5 |
Assess Spectrum Availability |
| | |
|
|
1.2.1.1-1.2.1.1-6 |
Assess Technical Requirements Document (TRD) Trace to Capability Development Document (CDD)/Initial Capabilities Document (ICD)/Operational Requirements Document (ORD) |
| | |
|
|
1.2.1.1-1.2.1.1-7 |
Assess Test & Evaluation Strategy |
| | |
|
|
1.2.1.1-1.2.1.1-8 |
Assess Spectrum Planning and Allocation |
| | | |
1.2.1.2 |
Program Software Planning |
| | |
|
|
1.2.1.2-1.2.1.2-1 |
Assess Government Plans, Activities, and Products |
| | |
|
|
1.2.1.2-1.2.1.2-2 |
Assess Government Pre-Contract Award Tasks for Software Mission Assurance |
| | |
|
|
1.2.1.2-1.2.1.2-3 |
Assess Pre-Milestone A Contractor Software-Related Plans, Activities, Processes, and Products |
| | |
|
|
1.2.1.2-1.2.1.2-4 |
Assess Government Software-Related Plans, Activities, and Products |
| | |
|
|
1.2.1.2-1.2.1.2-5 |
Assess Software-Related Independent Analyses |
|
1.3 |
Acquisition Planning |
| | |
1.3.1 |
Acquisition Strategy Development |
| | | |
1.3.1-1.3.1-1 |
Assess Program Office Infrastructure |
| | | |
1.3.1-1.3.1-2 |
Assess Program Risks |
| | | |
1.3.1-1.3.1-3 |
Assess Program Risk Mitigation Strategies |
| | | |
1.3.1-1.3.1-4 |
Assess Acquisition/Program Strategy |
| | | |
1.3.1-1.3.1-5 |
Assess Acquisition Strategy Document against Program Risk Mitigation Strategies |
| | |
1.3.2 |
RFP Development |
| | | |
1.3.2-1.3.2-1 |
Assess Request for Proposal (RFP) sub-factors and criteria |
| | | |
1.3.2-1.3.2-2 |
Assess Statement of Work, Contract Data Requirements List, Technical Requirements Document, and Work Breakdown Structure against Program Risk Mitigation Strategies |
| | | |
1.3.2-1.3.2-3 |
Assess Adequacy of Request for Proposal |
2 |
Program Planning & Systems Engineering |
|
2.1 |
Program Management |
| | |
2.1.1 |
Program Assurance |
| | | |
2.1.1-2.1.1-1 |
Assess Program Assurance |
| | | |
2.1.1-2.1.1-2 |
Assess Adequacy of System Engineering |
| | | |
2.1.1-2.1.1-3 |
Assess Government Furnished Equipment Verification Criteria and Responsibilities |
| | | |
2.1.1-2.1.1-4 |
Assess Mission Assurance Plan |
| | | |
2.1.1-2.1.1-5 |
Assess Program Risk Posture |
| | | |
2.1.1-2.1.1-6 |
Assess Technology Maturity and Readiness |
| | | |
2.1.1-2.1.1-7 |
Assess Mission Assurance Technical Baseline Assessment for Risk Posture |
| | | |
2.1.1-2.1.1-8 |
Assess Mission Assurance Technical Baseline Assessment for Environmental Test Thoroughness Assessment (ETTA) |
| | | |
2.1.1-2.1.1-9 |
Assess Mission Assurance Technical Baseline Assessment for Test-Like-You-Fly (TLYF) |
| | | |
2.1.1-2.1.1-10 |
Assess Mission Assurance Technical Baseline Assessment for Quality |
| | | |
2.1.1-2.1.1-11 |
Assess Mission Assurance Technical Baseline Assessment for Operations Readiness |
| | | |
2.1.1-2.1.1-12 |
Assess Mission Assurance Technical Baseline Assessment for Reliability |
| | | |
2.1.1-2.1.1-13 |
Assess Mission Assurance Technical Baseline Assessment for Parts, Material and Processes |
| | | |
2.1.1-2.1.1-14 |
Assess Mission Assurance Technical Baseline Assessment for Software |
| | | |
2.1.1-2.1.1-15 |
Assess Mission Assurance Technical Baseline Assessment for Cyber Security |
| | |
2.1.2 |
Technical Contract Support |
| | | |
2.1.2-2.1.2-1 |
Assess Technical Contract Support |
| | |
2.1.3 |
Program Risk Management |
| | | |
2.1.3-2.1.3-1 |
Assess Applicable Lessons Learned |
| | | |
2.1.3-2.1.3-2 |
Assess Program Risk Management Plan |
| | | |
2.1.3-2.1.3-3 |
Assess Risk Management Training |
| | | |
2.1.3-2.1.3-4 |
Assess Program Risk Baseline |
| | | |
2.1.3-2.1.3-5 |
Assess Program Risk Handling Plans |
| | | |
2.1.3-2.1.3-6 |
Assess Pre-Launch Risk Resolution |
| | | |
2.1.3-2.1.3-7 |
Assess Operational Risk Items |
| | | |
2.1.3-2.1.3-8 |
Assess Operational Lessons Learned |
| | | |
2.1.3-2.1.3-9 |
Assess Inclusion of AF Operational Risk Management (ORM) guidelines |
| | |
2.1.4 |
Program Configuration Management/Data Management |
| | | |
2.1.4-2.1.4-1 |
Assess Request for Proposal (RFP) Configuration Management (CM) Input |
| | | |
2.1.4-2.1.4-2 |
Assess Contractual Implementation of Configuration Management |
| | | |
2.1.4-2.1.4-3 |
Assess Functional Configuration Audit Process |
| | | |
2.1.4-2.1.4-4 |
Assess Physical Configuration Audit Process |
| | | |
2.1.4-2.1.4-5 |
Assess Configuration Identification Process |
| | | |
2.1.4-2.1.4-6 |
Assess Configuration Management Implementation |
| | |
2.1.5 |
Program Quality Management |
| | | |
2.1.5-2.1.5-1 |
Assess Contract Requirements for Quality Assurance |
| | | |
2.1.5-2.1.5-2 |
Assess Contractual Implementation of Quality Assurance Requirements |
| | | |
2.1.5-2.1.5-3 |
Assess Quality Management System |
| | | |
2.1.5-2.1.5-4 |
Assess Quality Assurance Processes |
| | | |
2.1.5-2.1.5-5 |
Assess Quality Control of Suppliers |
| | | |
2.1.5-2.1.5-6 |
Assess Specification Flow-Down Process |
| | | |
2.1.5-2.1.5-7 |
Assess Subcontractor Design Quality Assurance Processes |
| | | |
2.1.5-2.1.5-8 |
Assess Critical Design Review Items |
| | | |
2.1.5-2.1.5-9 |
Assess Manufacturing Readiness Review |
| | | |
2.1.5-2.1.5-10 |
Assess Test Readiness |
| | | |
2.1.5-2.1.5-11 |
Assess Material and Test Nonconformance Control |
| | | |
2.1.5-2.1.5-12 |
Assess Production Verification Audits |
| | | |
2.1.5-2.1.5-13 |
Assess Test and Integration Activities |
| | | |
2.1.5-2.1.5-14 |
Assess Hardware Acceptance Reviews |
| | | |
2.1.5-2.1.5-15 |
Assess Build and Sell-Off Quality Assurance Process |
| | | |
2.1.5-2.1.5-16 |
Assess Launch Site Quality Plan Assessment |
| | | |
2.1.5-2.1.5-17 |
Assess Launch Anomaly or On-Orbit Failure Analysis Review |
| | | |
2.1.5-2.1.5-18 |
Assess Technical Adequacy for Hardware Buyoff |
| | | |
2.1.5-2.1.5-19 |
Assess Technical Adequacy for Software Buyoff |
| | |
2.1.6 |
Program Software Management |
| | | |
2.1.6-2.1.6-1 |
Assess Government Software Plans, Activities, and Products |
| | | |
2.1.6-2.1.6-2 |
Assess Government Software Acquisition Management Approach |
| | | |
2.1.6-2.1.6-3 |
Assess Contractor Software Plans and Processes |
|
2.2 |
Program Systems Engineering |
| | |
2.2.1 |
Requirements Development |
| | | |
2.2.1-2.2.1-1 |
Assess Program Requirements Definition and Allocation |
| | | |
2.2.1-2.2.1-2 |
Assess System Requirements |
| | | |
2.2.1-2.2.1-3 |
Assess Requirement Set Integrity |
| | | |
2.2.1-2.2.1-4 |
Assess Requirements Verification and Tracking System |
| | |
2.2.2 |
Design Assurance |
| | | |
2.2.2-2.2.2-1 |
Assess and Evaluate Design |
| | | |
2.2.2-2.2.2-2 |
Assess Design Planning and Processes |
| | | |
2.2.2-2.2.2-3 |
Assess Segment Design |
| | | |
2.2.2-2.2.2-4 |
Assess System Design Baseline |
| | | |
2.2.2-2.2.2-5 |
Assess Mission Critical Fault Analysis |
| | |
2.2.3 |
Manufacture & Build Assurance |
| | | |
2.2.3-2.2.3-1 |
Assess Subcontractor Manufacturing Assurance Processes |
| | | |
2.2.3-2.2.3-2 |
Assess Program Manufacturing Management and System Control |
| | | |
2.2.3-2.2.3-3 |
Assess Contractor Manufacturing and Production Capability |
| | | |
2.2.3-2.2.3-4 |
Assess Manufacturing Processes |
| | |
2.2.4 |
Interfaces |
| | | |
2.2.4-2.2.4-1 |
Assess Adequacy of Interface Control Processes |
| | | |
2.2.4-2.2.4-2 |
Assess Interface Models, Simulation & Tools |
| | | |
2.2.4-2.2.4-3 |
Assess Interface Performance Validation |
| | | |
2.2.4-2.2.4-4 |
Assess Interface Requirements |
| | | |
2.2.4-2.2.4-5 |
Assess System and Interface Performance |
| | | |
2.2.4-2.2.4-6 |
Assess Interface Control Documentation |
| | |
2.2.5 |
Integration & Verification Planning |
| | | |
2.2.5-2.2.5-1 |
Assess Test and Evaluation Management |
| | | |
2.2.5-2.2.5-2 |
Assess Integration & Verification Requirements |
| | | |
2.2.5-2.2.5-3 |
Assess Test and Evaluation Master Plan (TEMP) or Other Test Management Plan |
| | | |
2.2.5-2.2.5-4 |
Assess Integration and Verification Risks |
| | | |
2.2.5-2.2.5-5 |
Assess Contractor Test Capability |
| | | |
2.2.5-2.2.5-6 |
Assess Ground Control and On-Orbit Test Perceptiveness |
| | | |
2.2.5-2.2.5-7 |
Assess Test Like You Fly Deviations |
| | | |
2.2.5-2.2.5-8 |
Assess Integration and Test Development |
| | | |
2.2.5-2.2.5-9 |
Assess Integration, Test and Evaluation as a Gated Process |
| | | |
2.2.5-2.2.5-10 |
Assess Test Like You Fly Planning |
| | | |
2.2.5-2.2.5-11 |
Assess Adequacy of Integration & Test Plans |
| | |
2.2.6 |
Integration & Verification Execution |
| | | |
2.2.6-2.2.6-1 |
Assess Integration & Test Results |
| | |
2.2.7 |
System Transition |
| | | |
2.2.7.1 |
System Validation |
| | |
|
|
2.2.7.1-2.2.7.1-1 |
Assess System Validation |
| | |
|
|
2.2.7.1-2.2.7.1-2 |
Assess System On-Orbit Check Out |
| | | |
2.2.7.2 |
Operational Transition |
| | |
|
|
2.2.7.2-2.2.7.2-1 |
Assess Physical System and System Support Readiness |
| | |
|
|
2.2.7.2-2.2.7.2-2 |
Assess Parallel Readiness Assessment Results |
| | |
|
|
2.2.7.2-2.2.7.2-3 |
Assess Deployment Tools, Processes and Procedures |
| | |
|
|
2.2.7.2-2.2.7.2-4 |
Assess Personnel and Resources |
| | |
|
|
2.2.7.2-2.2.7.2-5 |
Assess Transition Planning |
| | |
2.2.8 |
Reviews & Audits |
| | | |
2.2.8-2.2.8-1 |
Assess and Verify Adequacy of Technical Reviews |
| | | |
2.2.8-2.2.8-2 |
Assess Government Flight Readiness Review (FRR) |
| | | |
2.2.8-2.2.8-3 |
Assess Post Launch Review (PLR) |
| | | |
2.2.8-2.2.8-4 |
PLACEHOLDER |
| | | |
2.2.8-2.2.8-5 |
Assess Aerospace Readiness Review |
| | | |
2.2.8-2.2.8-6 |
Assess Launch Readiness Review |
|
2.3 |
Mission Assurance Disciplines |
| | |
2.3.1 |
System Safety |
| | | |
2.3.1-2.3.1-1 |
Assess System Safety Contractual Requirements |
| | | |
2.3.1-2.3.1-2 |
Assess System Safety Engineering and Management |
| | | |
2.3.1-2.3.1-3 |
Assess Hazards Analysis for Adequacy and Completeness |
| | | |
2.3.1-2.3.1-4 |
Assess System Safety Integration with Design Engineering |
| | | |
2.3.1-2.3.1-5 |
Assess Compliance with Orbital Debris Mitigation Requirements |
| | | |
2.3.1-2.3.1-6 |
Assess System Safety Deviations/Waivers |
| | | |
2.3.1-2.3.1-7 |
Assess System Engineering Process and Products |
| | | |
2.3.1-2.3.1-8 |
Assess Configuration Changes and Deviations/Waivers |
| | | |
2.3.1-2.3.1-9 |
Assess Safety Verification Process for Adequacy and Completeness |
| | | |
2.3.1-2.3.1-10 |
Assess Explosive Hazard Classification & Characteristics for Adequacy |
| | | |
2.3.1-2.3.1-11 |
Assess Explosive Ordnance Disposal Source Data for Adequacy and Completeness |
| | | |
2.3.1-2.3.1-12 |
Assess Process for Tracking and Mitigating Hazards |
| | | |
2.3.1-2.3.1-13 |
Assess Comprehensive Post Flight Analysis Review Plan for Completeness |
| | | |
2.3.1-2.3.1-14 |
Assess Compliance with Safety Requirements |
| | | |
2.3.1-2.3.1-15 |
Assess Feedback System Between Program Office and User |
| | | |
2.3.1-2.3.1-16 |
Assess System Safety Risk |
| | | |
2.3.1-2.3.1-17 |
Assess Integration and Qualification Test Planning |
| | |
2.3.2 |
Reliability Maintainability Availability |
| | | |
2.3.2-2.3.2-1 |
Assess Reliability, Maintainability and Availability Contractual Requirements |
| | | |
2.3.2-2.3.2-2 |
Assess Reliability Management |
| | | |
2.3.2-2.3.2-3 |
Assess Program Design in Relation to Reliability & Availability |
| | | |
2.3.2-2.3.2-4 |
Assess Critical/Limited Life Item Control |
| | | |
2.3.2-2.3.2-5 |
Assess the Failure Modes, Effects, and Criticality Analysis (FMECA) |
| | | |
2.3.2-2.3.2-6 |
Assess Reliability Analysis and Predictions |
| | | |
2.3.2-2.3.2-7 |
Assess Reliability Testing and Analysis |
| | | |
2.3.2-2.3.2-8 |
Assess Program Reliability & Availability Verification |
| | | |
2.3.2-2.3.2-9 |
Assess Environmental Stress Screening (ESS) Verification |
| | | |
2.3.2-2.3.2-10 |
Assess Failure Analysis and Correction Action Boards |
| | | |
2.3.2-2.3.2-11 |
Assess Operational Readiness |
| | | |
2.3.2-2.3.2-12 |
Assess Launch/On-Orbit Anomaly Resolution |
| | |
2.3.3 |
Parts Materials & Processes (PM&P) |
| | | |
2.3.3-2.3.3-1 |
Assess Request For Proposal (RFP) Program Parts, Material, and Processes (PM&P) Management Requirements |
| | | |
2.3.3-2.3.3-2 |
Assess Parts, Material, and Processes (PM&P) Management Requirements and Control Program Plan |
| | | |
2.3.3-2.3.3-3 |
Assess Program Approved Parts, Material, and Processes List |
| | | |
2.3.3-2.3.3-4 |
Assess Parts, Material, and Processes Products/Implementation |
| | | |
2.3.3-2.3.3-5 |
Assess Parts, Material, and Processes Anomaly Resolution |
| | | |
2.3.3-2.3.3-6 |
Assess Fabrication and Integration Parts, Material, and Processes (PM&P) Process |
| | | |
2.3.3-2.3.3-7 |
PLACEHOLDER |
| | | |
2.3.3-2.3.3-8 |
Assess Impact of Problem Alert Systems on Program PM&P |
| | | |
2.3.3-2.3.3-9 |
Assess Parts at Risk for Obsolescence |
| | |
2.3.4 |
Electrical Design Integration |
| | | |
2.3.4-2.3.4-1 |
Assess EDI Requirements Definition |
| | | |
2.3.4-2.3.4-2 |
Assess EDI Design |
| | | |
2.3.4-2.3.4-3 |
Assess EDI Analyses |
| | | |
2.3.4-2.3.4-4 |
Assess EDI Verification Execution and Results |
| | |
2.3.5 |
Mechanical Design Integration |
| | | |
2.3.5-2.3.5-1 |
Assess Mechanical Design Integration Requirements |
| | | |
2.3.5-2.3.5-2 |
Assess Mechanical Design Integration Implementation |
| | | |
2.3.5-2.3.5-3 |
Assess Mechanical Design Integration Analysis |
| | | |
2.3.5-2.3.5-4 |
Assess Mechanical Design Integration Manufacture and Build |
| | |
2.3.6 |
Electromagnetic Interference/Electromagnetic Compatibility (EMI/EMC) |
| | | |
2.3.6-2.3.6-1 |
Assess EMI/EMC Systems Engineering |
| | | |
2.3.6-2.3.6-2 |
Assess EMI/EMC Requirements |
| | | |
2.3.6-2.3.6-3 |
Assess EMI/EMC Design |
| | | |
2.3.6-2.3.6-4 |
Assess EMI/EMC Testing |
| | |
2.3.7 |
Mass Properties |
| | | |
2.3.7-2.3.7-1 |
Assess Mass Properties Control |
| | | |
2.3.7-2.3.7-2 |
Assess Mass Properties Analysis |
| | | |
2.3.7-2.3.7-3 |
Assess Mass Properties Verification |
| | | |
2.3.7-2.3.7-4 |
Assess Mass Properties Data Management |
| | | |
2.3.7-2.3.7-5 |
Assess Mass Properties Documentation |
| | |
2.3.8 |
Contamination Control |
| | | |
2.3.8-2.3.8-1 |
Assess Contamination Control Requirement Analysis and Verification |
| | | |
2.3.8-2.3.8-2 |
Assess Design Assurance and Contamination Control |
| | | |
2.3.8-2.3.8-3 |
Assess Manufacturing Assurance and Contamination Control |
| | | |
2.3.8-2.3.8-4 |
Assess Quality Assurance and Contamination Control |
| | | |
2.3.8-2.3.8-5 |
Assess Test & Integration and Contamination Control |
| | |
2.3.9 |
System Survivability |
| | | |
2.3.9-2.3.9-1 |
Assess Request for Proposal and Contract Requirements for Survivability |
| | | |
2.3.9-2.3.9-2 |
Assess Survivability Requirements |
| | | |
2.3.9-2.3.9-3 |
Assess Survivability Planning |
| | | |
2.3.9-2.3.9-4 |
Assess Survivability System Engineering |
| | | |
2.3.9-2.3.9-5 |
Assess Survivability Design |
| | | |
2.3.9-2.3.9-6 |
Assess Survivability Analyses |
| | | |
2.3.9-2.3.9-7 |
Assess Survivability Testing |
| | | |
2.3.9-2.3.9-8 |
Assess Production Support for Survivability |
| | |
2.3.10 |
Supportability (Logistics) |
| | | |
2.3.10-2.3.10-1 |
Assess Packaging, Handling, Storage, and Transportability |
| | | |
2.3.10-2.3.10-2 |
Assess Logistics Support Analyses |
| | |
2.3.11 |
Software Engineering |
| | | |
2.3.11-2.3.11-1 |
Assess Software Program Assurance |
| | | |
2.3.11-2.3.11-2 |
Assess Software Risk Identification and Management |
| | | |
2.3.11-2.3.11-3 |
Assess Contractor Software-Related Plans and Processes |
| | | |
2.3.11-2.3.11-4 |
Assess Software Plans and Processes |
| | | |
2.3.11-2.3.11-5 |
Assess Software Integration and Qualification Test Planning |
| | |
2.3.12 |
Cyber Security |
| | | |
2.3.12-2.3.12-1 |
Assess System Categorization |
| | | |
2.3.12-2.3.12-2 |
Assess Cybersecurity Control Selection |
| | | |
2.3.12-2.3.12-3 |
Assess Cybersecurity Requirements |
| | | |
2.3.12-2.3.12-4 |
Assess Cybersecurity Architecture |
| | | |
2.3.12-2.3.12-5 |
Assess Cybersecurity Design |
| | | |
2.3.12-2.3.12-6 |
Assess Cyber Application Security |
| | | |
2.3.12-2.3.12-7 |
Assess Cyber Operating System Security |
| | | |
2.3.12-2.3.12-8 |
Assess Cyber Network Security |
| | | |
2.3.12-2.3.12-9 |
Assess Cybersecurity Implementation and Unit Testing |
| | | |
2.3.12-2.3.12-10 |
Assess Cybersecurity Cryptographic Product Acquisition |
| | | |
2.3.12-2.3.12-11 |
Assess Cybersecurity Key Management Process |
| | | |
2.3.12-2.3.12-12 |
Assess Cybersecurity Verification Test Planning |
| | | |
2.3.12-2.3.12-13 |
Assess Cybersecurity Verification |
| | | |
2.3.12-2.3.12-14 |
Assess Cybersecurity System Authorization Activities |
| | | |
2.3.12-2.3.12-15 |
Assess Program Protection Planning |
| | | |
2.3.12-2.3.12-16 |
Assess Criticality Analysis Process and CPI and CC Identification Process |
| | | |
2.3.12-2.3.12-17 |
Assess Threat and Vulnerability Analysis |
| | | |
2.3.12-2.3.12-18 |
Assess Counter Measure Analysis Process |
| | | |
2.3.12-2.3.12-19 |
Assess Program Protection Risk Analysis |
| | | |
2.3.12-2.3.12-20 |
Assess Analysis of Foreign Involvement with Program |
| | | |
2.3.12-2.3.12-21 |
Assess Program Protection Execution |
| | |
2.3.13 |
Frequency Management |
| | | |
2.3.13-2.3.13-1 |
Assess Spectrum Management Plan and Supporting Processes |
| | | |
2.3.13-2.3.13-2 |
Assess Spectrum Support Strategies |
| | | |
2.3.13-2.3.13-3 |
Assess Spectrum Compliance Activities |
| | | |
2.3.13-2.3.13-4 |
Assess Spectrum Registration Requirements |
| | |
2.3.14 |
Human Factors Engineering |
| | | |
2.3.14-2.3.14-1 |
Assess Human System Integration Requirements |
| | | |
2.3.14-2.3.14-2 |
Assess Human System Integration with Operation Concepts |
| | | |
2.3.14-2.3.14-3 |
Assess Human System Integration System Analysis |
| | | |
2.3.14-2.3.14-4 |
Assess Human System Integration Manpower |
| | | |
2.3.14-2.3.14-5 |
Assess Human System Integration Habitability |
| | | |
2.3.14-2.3.14-6 |
Assess Human System Integration System Safety |
| | | |
2.3.14-2.3.14-7 |
Assess Human System Integration Occupational Health |
| | | |
2.3.14-2.3.14-8 |
Assess Human System Integration Human Survivability |
| | | |
2.3.14-2.3.14-9 |
Assess Human System Integration Training |
| | | |
2.3.14-2.3.14-10 |
Assess Human System Integration Human Factors Engineering |
| | | |
2.3.14-2.3.14-11 |
Assess Human System Integration Maintainability |
| | | |
2.3.14-2.3.14-12 |
Assess Human System Integration Manufacturing Environment |
| | | |
2.3.14-2.3.14-13 |
Assess Human System Integration Test Planning |
| | | |
2.3.14-2.3.14-14 |
Assess Human System Integration Testing |
| | |
2.3.15 |
Environmental, Safety, and Health |
| | | |
2.3.15-2.3.15-1 |
Assess Environmental, Safety, and Health Requirements, Processes, and Activities |
| | |
2.3.16 |
Cables and Harnesses |
| | | |
2.3.16-2.3.16-1 |
Assess Cable and Harness Assurance Elements |
| | | |
2.3.16-2.3.16-2 |
Assess Cable and Harness Risk Identification and Management |
| | | |
2.3.16-2.3.16-3 |
Assess Cable and Harness Requirements Definition |
| | | |
2.3.16-2.3.16-4 |
Assess Cable and Harness Design |
| | | |
2.3.16-2.3.16-5 |
Assess Cable and Harness Verification Planning |
| | | |
2.3.16-2.3.16-6 |
Assess Cable and Harness Analyses |
| | | |
2.3.16-2.3.16-7 |
Assess Cable and Harness Manufacturing and Build |
| | | |
2.3.16-2.3.16-8 |
Assess Cable and Harness Interfaces |
| | | |
2.3.16-2.3.16-9 |
Assess Cable and Harness Integration and Test Plan |
| | | |
2.3.16-2.3.16-10 |
Assess Cable and Harness Verification Execution and Results |
| | | |
2.3.16-2.3.16-11 |
Assess Cable and Harness Operational Readiness |
| | |
2.3.17 |
Dead Bus Recovery |
| | | |
2.3.17-2.3.17-1 |
Assess Dead Bus Recovery Requirements |
| | | |
2.3.17-2.3.17-2 |
Assess Dead Bus Recovery Design and Capabilities |
| | | |
2.3.17-2.3.17-3 |
Assess Dead Bus Recovery Limitations and Risks |
| | | |
2.3.17-2.3.17-4 |
Assess Dead Bus Recovery Operation Constraints |
| | | |
2.3.17-2.3.17-5 |
Assess Dead Bus Recovery Capability Verification Planning |
| | | |
2.3.17-2.3.17-6 |
Assess Dead Bus Recovery Capability Verification Execution and Results |
| | | |
2.3.17-2.3.17-7 |
Assess Dead Bus Recovery Operations |
3 |
Launch Preparation & Integration |
|
3.1 |
Launch Site Integration |
| | |
3.1-3.1-1 |
Assess System Interface Compliance |
| | |
3.1-3.1-2 |
Assess Contractor Maintenance Processes & Data |
| | |
3.1-3.1-3 |
Assess Critical System Modifications & Engineering Change Requests |
| | |
3.1-3.1-4 |
Assess Critical Repair and Replace Actions |
| | |
3.1-3.1-5 |
Assess Contractor Cause & Corrective Action Efforts/Anomalies |
| | |
3.1-3.1-6 |
Assess Base Infrastructure |
| | |
3.1-3.1-7 |
Assess RF Emitter Risks and Controls |
| | |
3.1-3.1-8 |
Assess AFSCN Compatibility Testing |
| | |
3.1-3.1-9 |
Assess Over flight Risk |
| | |
3.1-3.1-10 |
Assess Program Requirement Document (PRD) Compliance |
| | |
3.1-3.1-11 |
Assess SV Transportation Systems Maintenance |
| | |
3.1-3.1-12 |
Assess SV Transportation Systems Modifications & Engineering Change Requests |
| | |
3.1-3.1-13 |
Assess SV Transportation Systems Interface/Capability Compliance |
| | |
3.1-3.1-14 |
Assess SV Transportation Systems Operational Planning |
| | |
3.1-3.1-15 |
Assess SV Transportation Systems Cause & Corrective Action/Anomalies |
| | |
3.1-3.1-16 |
Assess SV Fueling Systems Maintenance |
| | |
3.1-3.1-17 |
Assess SV Fueling Systems Modifications & Engineering Change Requests |
| | |
3.1-3.1-18 |
Assess SV Fueling Systems Interface/Capability Compliance |
| | |
3.1-3.1-19 |
Assess SV Fueling Systems Operational Planning |
| | |
3.1-3.1-20 |
Assess SV Fueling Systems Cause & Corrective Action/Anomalies |
| | |
3.1-3.1-21 |
Assess Plans/Procedures & Schedules to support SV processing |
| | |
3.1-3.1-22 |
Assess Lessons Learned for SV processing |
| | |
3.1-3.1-23 |
Assess Critical Operations, Tests and Anomalies for SV processing |
| | |
3.1-3.1-24 |
Assess On-console Rehearsal & Launch Support |
| | |
3.1-3.1-25 |
Assess Payload Safety |
| | |
3.1-3.1-26 |
Assess Structural and Mechanical Interfaces |
| | |
3.1-3.1-27 |
Assess Electrical Interfaces |
| | |
3.1-3.1-28 |
Assess Spacecraft Environments |
| | |
3.1-3.1-29 |
Assess Dynamics |
| | |
3.1-3.1-30 |
Assess EMC/EMI |
| | |
3.1-3.1-31 |
Assess Mission Design |
| | |
3.1-3.1-32 |
Assess Ground Operations |
| | |
3.1-3.1-33 |
Assess Safety |
| | |
3.1-3.1-34 |
Assess System Engineering Readiness and Mission Technical Risk |
| | |
3.1-3.1-35 |
Assess Adequacy of Mission Analyses and Flight Software through IV&V |
| | |
3.1-3.1-36 |
Assess Mission Readiness |
4 |
Space Segment |
|
4.2 |
Space Segment Systems Engineering |
| | |
4.2-4.2-1 |
Assess Space Segment Program Assurance Elements |
| | |
4.2-4.2-2 |
Assess Space Segment Risk Identification and Management |
| | |
4.2-4.2-3 |
Assess Space Segment Requirements Definition and Allocation |
| | |
4.2-4.2-4 |
Assess Space Segment Design |
| | |
4.2-4.2-5 |
Assess Space Segment Verification Planning |
| | |
4.2-4.2-6 |
Assess Space Segment Analysis |
| | |
4.2-4.2-7 |
Assess Space Segment Manufacturing and Build |
| | |
4.2-4.2-8 |
Assess Space Segment Interfaces |
| | |
4.2-4.2-9 |
Assess Space Segment Integration and Test Planning |
| | |
4.2-4.2-10 |
Assess Space Segment Verification Execution and Results |
| | |
4.2-4.2-11 |
Assess Space Segment Operational Readiness |
|
4.4 |
Spacecraft Bus Element |
| | |
4.4.2 |
Bus Element Systems Engineering |
| | | |
4.4.2-4.4.2-1 |
Assess Bus System Program Assurance Elements |
| | | |
4.4.2-4.4.2-2 |
Assess Bus System Risk Identification and Management |
| | | |
4.4.2-4.4.2-3 |
Assess Bus System Requirements Definition and Allocation |
| | | |
4.4.2-4.4.2-4 |
Assess Bus System Design |
| | | |
4.4.2-4.4.2-5 |
Assess Bus System Verification Planning |
| | | |
4.4.2-4.4.2-6 |
Assess Bus System Analysis |
| | | |
4.4.2-4.4.2-7 |
Assess Bus System Manufacturing and Build |
| | | |
4.4.2-4.4.2-8 |
Assess Bus System Interfaces |
| | | |
4.4.2-4.4.2-9 |
Assess Bus System Integration and Test Planning |
| | | |
4.4.2-4.4.2-10 |
Assess Bus System Verification Execution and Results |
| | | |
4.4.2-4.4.2-11 |
Assess Bus System Operational Readiness |
| | |
4.4.4 |
Structures & Mechanisms Subsystem (SMS) |
| | | |
4.4.4-4.4.4-1 |
Assess SMS Program Assurance Elements |
| | | |
4.4.4-4.4.4-2 |
Assess SMS Risk Identification and Management |
| | | |
4.4.4-4.4.4-3 |
Assess SMS Requirements Definition |
| | | |
4.4.4-4.4.4-4 |
Assess SMS Design |
| | | |
4.4.4-4.4.4-5 |
Assess SMS Verification Planning |
| | | |
4.4.4-4.4.4-6 |
Assess SMS Analyses |
| | | |
4.4.4-4.4.4-7 |
Assess SMS Manufacturing and Build |
| | | |
4.4.4-4.4.4-8 |
Assess SMS Interfaces |
| | | |
4.4.4-4.4.4-9 |
Assess SMS Integration and Test Planning |
| | | |
4.4.4-4.4.4-10 |
Assess SMS Verification Execution and Results |
| | | |
4.4.4-4.4.4-11 |
Assess SMS Operational Readiness |
| | | |
4.4.4.4 |
Structures |
| | |
|
|
4.4.4.4-4.4.4.4-4 |
Assess Structures Design |
| | |
|
|
4.4.4.4-4.4.4.4-5 |
Assess Structures Verification Planning |
| | |
|
|
4.4.4.4-4.4.4.4-6 |
Assess Structures Analysis |
| | |
|
|
4.4.4.4-4.4.4.4-7 |
Assess Structures Manufacturing and Build |
| | |
|
|
4.4.4.4-4.4.4.4-10 |
Assess Structures Verification Execution and Results |
| | | |
4.4.4.5 |
Mechanisms & Deployables |
| | |
|
|
4.4.4.5-4.4.4.5-4 |
Assess Mechanisms & Deployables Design |
| | |
|
|
4.4.4.5-4.4.4.5-5 |
Assess Mechanisms & Deployables Verification Planning |
| | |
|
|
4.4.4.5-4.4.4.5-6 |
Assess Mechanisms & Deployables Analyses |
| | |
|
|
4.4.4.5-4.4.4.5-10 |
Assess Mechanisms & Deployables Verification Execution and Results |
| | |
|
|
4.4.4.5-4.4.4.5-11 |
Assess Mechanisms & Deployables Operational Readiness |
| | | |
4.4.4.6 |
Structural Dynamics |
| | |
|
|
4.4.4.6-4.4.4.6-4 |
Assess Structural Dynamics Design |
| | |
|
|
4.4.4.6-4.4.4.6-5 |
Assess Structural Dynamics Verification Planning |
| | |
|
|
4.4.4.6-4.4.4.6-6 |
Assess Structural Dynamics Analyses |
| | | |
4.4.4.7 |
Ordnance/Pyrotechnics |
| | |
|
|
4.4.4.7-4.4.4.7-3 |
Assess Ordnance/Pyrotechnics Requirements Definition |
| | |
|
|
4.4.4.7-4.4.4.7-4 |
Assess Ordnance/Pyrotechnic Design |
| | |
|
|
4.4.4.7-4.4.4.7-5 |
Assess Ordnance/Pyrotechnics Verification Planning |
| | |
|
|
4.4.4.7-4.4.4.7-6 |
Assess Ordnance/Pyrotechnics Analyses |
| | |
|
|
4.4.4.7-4.4.4.7-7 |
Assess Ordnance/Pyrotechnics Manufacturing and Build |
| | |
|
|
4.4.4.7-4.4.4.7-8 |
Assess Ordnance/Pyrotechnics Interfaces |
| | |
|
|
4.4.4.7-4.4.4.7-9 |
Assess Ordnance/Pyrotechnics Integration and Test Planning |
| | |
|
|
4.4.4.7-4.4.4.7-10 |
Assess Ordnance/Pyrotechnics Verification Execution and Results |
| | |
4.4.5 |
Electrical Power & Distribution Subsystem (EPDS) |
| | | |
4.4.5-4.4.5-1 |
Assess EPDS Program Assurance Elements |
| | | |
4.4.5-4.4.5-2 |
Assess EPDS Risk Identification and Management |
| | | |
4.4.5-4.4.5-3 |
Assess EPDS Requirements Definition |
| | | |
4.4.5-4.4.5-4 |
Assess EPDS Design |
| | | |
4.4.5-4.4.5-5 |
Assess EPDS Verification Planning |
| | | |
4.4.5-4.4.5-6 |
Assess EPDS Analyses |
| | | |
4.4.5-4.4.5-7 |
Assess EPDS Manufacturing and Build |
| | | |
4.4.5-4.4.5-8 |
Assess EPDS Interfaces |
| | | |
4.4.5-4.4.5-9 |
Assess EPDS Integration and Test Planning |
| | | |
4.4.5-4.4.5-10 |
Assess EPDS Verification Execution and Results |
| | | |
4.4.5-4.4.5-11 |
Assess EPDS Operational Readiness |
| | |
4.4.6 |
Thermal Control Subsystem (TCS) |
| | | |
4.4.6-4.4.6-1 |
Assess TCS Program Assurance Elements |
| | | |
4.4.6-4.4.6-2 |
Assess TCS Risk Identification and Management |
| | | |
4.4.6-4.4.6-3 |
Assess TCS Requirements Definition |
| | | |
4.4.6-4.4.6-4 |
Assess TCS Design |
| | | |
4.4.6-4.4.6-5 |
Assess TCS Verification Planning |
| | | |
4.4.6-4.4.6-6 |
Assess TCS Analyses |
| | | |
4.4.6-4.4.6-7 |
Assess TCS Manufacturing and Build |
| | | |
4.4.6-4.4.6-8 |
Assess TCS Interfaces |
| | | |
4.4.6-4.4.6-9 |
Assess TCS Integration and Test Planning |
| | | |
4.4.6-4.4.6-10 |
Assess TCS Verification Execution and Results |
| | | |
4.4.6-4.4.6-11 |
Assess TCS Operational Readiness |
| | |
4.4.7 |
Attitude Control Subsystem (ACS) |
| | | |
4.4.7-4.4.7-1 |
Assess ACS Program Assurance Elements |
| | | |
4.4.7-4.4.7-2 |
Assess ACS Risk Identification and Management |
| | | |
4.4.7-4.4.7-3 |
Assess ACS Requirements Definition |
| | | |
4.4.7-4.4.7-4 |
Assess ACS Design |
| | | |
4.4.7-4.4.7-5 |
Assess ACS Verification Planning |
| | | |
4.4.7-4.4.7-6 |
Assess ACS Analyses |
| | | |
4.4.7-4.4.7-7 |
Assess ACS Manufacturing and Build |
| | | |
4.4.7-4.4.7-8 |
Assess ACS Interfaces |
| | | |
4.4.7-4.4.7-9 |
Assess ACS Integration and Test Planning |
| | | |
4.4.7-4.4.7-10 |
Assess ACS Verification Execution and Results |
| | | |
4.4.7-4.4.7-11 |
Assess ACS Operational Readiness |
| | |
4.4.8 |
Propulsion Subsystem (PS) |
| | | |
4.4.8-4.4.8-1 |
Assess Propulsion Program Assurance Elements |
| | | |
4.4.8-4.4.8-2 |
Assess Propulsion Risk Identification and Management |
| | | |
4.4.8-4.4.8-3 |
Assess Propulsion Requirements Definition |
| | | |
4.4.8-4.4.8-4 |
Assess Propulsion Design |
| | | |
4.4.8-4.4.8-5 |
Assess Propulsion Verification Planning |
| | | |
4.4.8-4.4.8-6 |
Assess Propulsion Analyses |
| | | |
4.4.8-4.4.8-7 |
Assess Propulsion Manufacturing and Build |
| | | |
4.4.8-4.4.8-8 |
Assess Propulsion Interfaces |
| | | |
4.4.8-4.4.8-9 |
Assess Propulsion Integration and Test Planning |
| | | |
4.4.8-4.4.8-10 |
Assess Propulsion Verification Execution and Results |
| | | |
4.4.8-4.4.8-11 |
Assess Propulsion Operational Readiness |
| | |
4.4.9 |
Telemetry Tracking & Command Subsystem (TT&C) |
| | | |
4.4.9-4.4.9-1 |
Assess TT&C Program Assurance Elements |
| | | |
4.4.9-4.4.9-2 |
Assess TT&C Risk Identification and Management |
| | | |
4.4.9-4.4.9-3 |
Assess TT&C Requirements Definition |
| | | |
4.4.9-4.4.9-4 |
Assess TT&C Design |
| | | |
4.4.9-4.4.9-5 |
Assess TT&C Verification Planning |
| | | |
4.4.9-4.4.9-6 |
Assess TT&C Analyses |
| | | |
4.4.9-4.4.9-7 |
Assess TT&C Manufacturing and Build |
| | | |
4.4.9-4.4.9-8 |
Assess TT&C Interfaces |
| | | |
4.4.9-4.4.9-9 |
Assess TT&C Integration and Test Planning |
| | | |
4.4.9-4.4.9-10 |
Assess TT&C Verification Execution and Results |
| | | |
4.4.9-4.4.9-11 |
Assess TT&C Operational Readiness |
| | | |
4.4.9-4.4.9-12 |
Assess Spectrum Planning and Allocation |
| | |
4.4.10 |
Command & Data Handling Subsystem (C&DH) |
| | | |
4.4.10-4.4.10-1 |
Assess C&DH Program Assurance Elements |
| | | |
4.4.10-4.4.10-2 |
Assess C&DH Risk Identification and Management |
| | | |
4.4.10-4.4.10-3 |
Assess C&DH Requirements Definition |
| | | |
4.4.10-4.4.10-4 |
Assess C&DH Design |
| | | |
4.4.10-4.4.10-5 |
Assess C&DH Verification Planning |
| | | |
4.4.10-4.4.10-6 |
Assess C&DH Analyses |
| | | |
4.4.10-4.4.10-7 |
Assess C&DH Manufacturing and Build |
| | | |
4.4.10-4.4.10-8 |
Assess C&DH Interfaces |
| | | |
4.4.10-4.4.10-9 |
Assess C&DH Integration and Test Planning |
| | | |
4.4.10-4.4.10-10 |
Assess C&DH Verification Execution and Results |
| | | |
4.4.10-4.4.10-11 |
Assess C&DH Operational Readiness |
| | |
4.4.11 |
Fault Management Subsystem (FMS) |
| | | |
4.4.11-4.4.11-1 |
Assess FMS Program Assurance Elements |
| | | |
4.4.11-4.4.11-2 |
Assess FMS Risk Identification and Management |
| | | |
4.4.11-4.4.11-3 |
Assess FMS Requirements Definition |
| | | |
4.4.11-4.4.11-4 |
Assess FMS Design |
| | | |
4.4.11-4.4.11-5 |
Assess FMS Verification Planning |
| | | |
4.4.11-4.4.11-6 |
Assess FMS Analyses |
| | | |
4.4.11-4.4.11-7 |
Assess FMS Manufacturing and Build |
| | | |
4.4.11-4.4.11-8 |
Assess FMS Interfaces |
| | | |
4.4.11-4.4.11-9 |
Assess FMS Integration and Test Planning |
| | | |
4.4.11-4.4.11-10 |
Assess FMS Verification Execution and Results |
| | | |
4.4.11-4.4.11-11 |
Assess FMS Operational Readiness |
| | |
4.4.12 |
Software Subsystem (SS) |
| | | |
4.4.12-4.4.12-1 |
Assess Software-Related Independent Analyses |
| | | |
4.4.12-4.4.12-2 |
Assess Contractor Software-Related Processes |
| | | |
4.4.12-4.4.12-3 |
Assess Contractor Software-Related Development Products |
| | | |
4.4.12-4.4.12-4 |
Assess Contractor Software-Related Plans |
| | | |
4.4.12-4.4.12-5 |
Assess Software Subsystem Test and Installation Activities |
| | | |
4.4.12-4.4.12-6 |
Assess Software Subsystem Verification and Execution |
|
4.5 |
Payload Element |
| | |
4.5.2 |
Payload Element Systems Engineering |
| | | |
4.5.2-4.5.2-1 |
Assess Payload Program Assurance Elements |
| | | |
4.5.2-4.5.2-2 |
Assess Payload Risk Identification and Management |
| | | |
4.5.2-4.5.2-3 |
Assess Payload Requirements Definition and Allocation |
| | | |
4.5.2-4.5.2-4 |
Assess Payload Design |
| | | |
4.5.2-4.5.2-5 |
Assess Payload Verification Planning |
| | | |
4.5.2-4.5.2-6 |
Assess Payload Analysis |
| | | |
4.5.2-4.5.2-7 |
Assess Payload Manufacturing and Build |
| | | |
4.5.2-4.5.2-8 |
Assess Payload Interfaces |
| | | |
4.5.2-4.5.2-9 |
Assess Payload Integration and Test Planning |
| | | |
4.5.2-4.5.2-10 |
Assess Payload Verification Execution and Results |
| | | |
4.5.2-4.5.2-11 |
Assess Payload Operational Readiness |
| | | |
4.5.2-4.5.2-12 |
Assess Spectrum Planning and Allocation |
| | |
4.5.4 |
Communications |
| | | |
4.5.4-4.5.4-1 |
Assess Communications Payload Program Assurance Elements |
| | | |
4.5.4-4.5.4-2 |
Assess Communications Payload Risk Identification and Management |
| | | |
4.5.4-4.5.4-3 |
Assess Communications Payload Requirements Definition |
| | | |
4.5.4-4.5.4-4 |
Assess Communications Payload Design |
| | | |
4.5.4-4.5.4-5 |
Assess Communications Payload Verification Planning |
| | | |
4.5.4-4.5.4-6 |
Assess Communications Payload Analyses |
| | | |
4.5.4-4.5.4-7 |
Assess Communications Payload Manufacturing and Build |
| | | |
4.5.4-4.5.4-8 |
Assess Communications Payload Interfaces |
| | | |
4.5.4-4.5.4-9 |
Assess Communications Payload Integration and Test Planning |
| | | |
4.5.4-4.5.4-10 |
Assess Communications Payload Verification Execution and Results |
| | | |
4.5.4-4.5.4-11 |
Assess Communications Payload Operational Readiness |
| | | |
4.5.4-4.5.4-12 |
Assess Communications Payload Operations and Sustainment |
| | | |
4.5.4-4.5.4-13 |
Assess Frequency Planning and Allocation |
| | |
4.5.5 |
Optical |
| | | |
4.5.5-4.5.5-1 |
Assess Optical Payload Program Assurance Elements |
| | | |
4.5.5-4.5.5-2 |
Assess Optical Payload Risk Identification and Management |
| | | |
4.5.5-4.5.5-3 |
Assess Optical Payload Requirements Definition |
| | | |
4.5.5-4.5.5-4 |
Assess Optical Payload Design |
| | | |
4.5.5-4.5.5-5 |
Assess Optical Payload Verification Planning |
| | | |
4.5.5-4.5.5-6 |
Assess Optical Payload Analyses |
| | | |
4.5.5-4.5.5-7 |
Assess Optical Payload Manufacturing and Build |
| | | |
4.5.5-4.5.5-8 |
Assess Optical Payload Interfaces |
| | | |
4.5.5-4.5.5-9 |
Assess Optical Payload Integration and Test Planning |
| | | |
4.5.5-4.5.5-10 |
Assess Optical Payload Verification Execution and Results |
| | | |
4.5.5-4.5.5-11 |
Assess Optical Payload Operational Readiness |
| | | |
4.5.5-4.5.5-12 |
Assess Optical Payload Operations and Sustainment |
| | |
4.5.6 |
Navigation |
| | | |
4.5.6-4.5.6-1 |
Assess Navigation Payload Program Assurance Elements |
| | | |
4.5.6-4.5.6-2 |
Assess Navigation Payload Risk Identification and Management |
| | | |
4.5.6-4.5.6-3 |
Assess Navigation Payload Requirements Definition |
| | | |
4.5.6-4.5.6-4 |
Assess Navigation Payload Design |
| | | |
4.5.6-4.5.6-5 |
Assess Navigation Payload Verification Planning |
| | | |
4.5.6-4.5.6-6 |
Assess Navigation Payload Analysis |
| | | |
4.5.6-4.5.6-7 |
Assess Navigation Payload Manufacturing and Build |
| | | |
4.5.6-4.5.6-8 |
Assess Navigation Payload Interfaces |
| | | |
4.5.6-4.5.6-9 |
Assess Navigation Payload Integration and Test Planning |
| | | |
4.5.6-4.5.6-10 |
Assess Navigation Payload Verification Execution and Results |
| | | |
4.5.6-4.5.6-11 |
Assess Navigation Payload Operational Readiness |
| | | |
4.5.6-4.5.6-12 |
Assess Navigation Payload Operations and Sustainment |
| | | |
4.5.6-4.5.6-13 |
Assess Navigation Payload Frequency Planning and Allocation |
| | |
4.5.7 |
Hosted Payload |
| | | |
4.5.7-4.5.7-1 |
Assess Hosted Payload Systems Engineering |
| | | |
4.5.7-4.5.7-2 |
Assess Attitude Control Do No Harm |
| | | |
4.5.7-4.5.7-3 |
Assess Attitude Control Accommodation |
| | | |
4.5.7-4.5.7-4 |
Assess Command and Data Handling Do No Harm |
| | | |
4.5.7-4.5.7-5 |
Assess Command and Data Handling Accommodation |
| | | |
4.5.7-4.5.7-6 |
Assess Contamination Do No Harm |
| | | |
4.5.7-4.5.7-7 |
Assess Integration and Test Accommodation |
| | | |
4.5.7-4.5.7-8 |
Assess Structural Dynamics Accommodation |
| | | |
4.5.7-4.5.7-9 |
Assess Electrical Design Integration Accommodation |
| | | |
4.5.7-4.5.7-10 |
Assess Electrical Interface Design and Integration Do No Harm |
| | | |
4.5.7-4.5.7-11 |
Assess Electrical Interface Design and Integration Accommodation |
| | | |
4.5.7-4.5.7-12 |
Assess EMI/EMC Do No Harm |
| | | |
4.5.7-4.5.7-13 |
Assess EMI/EMC Accommodation |
| | | |
4.5.7-4.5.7-14 |
Assess Fault Management Do No Harm |
| | | |
4.5.7-4.5.7-15 |
Assess Mechanical Integration and Test Do No Harm |
| | | |
4.5.7-4.5.7-16 |
Assess Mechanical Design Integration Accommodation |
| | | |
4.5.7-4.5.7-17 |
Assess Operational Accommodation |
| | | |
4.5.7-4.5.7-18 |
Assess Optical Do No Harm |
| | | |
4.5.7-4.5.7-19 |
Assess Power Do No Harm |
| | | |
4.5.7-4.5.7-20 |
Assess Power Accommodation |
| | | |
4.5.7-4.5.7-21 |
Assess Safety and Reliability Do No Harm |
| | | |
4.5.7-4.5.7-22 |
Assess Structural and Mechanical Do No Harm |
| | | |
4.5.7-4.5.7-23 |
Assess Structural and Mechanical Accommodation |
| | | |
4.5.7-4.5.7-24 |
Assess Thermal Do No Harm |
| | | |
4.5.7-4.5.7-25 |
Assess Thermal Accommodation |
|
4.6 |
Space Vehicle Ground Support Equipment |
| | |
4.6-4.6-1 |
Assess Space Vehicle Ground Support Equipment Requirements Definition |
| | |
4.6-4.6-2 |
Assess Space Vehicle Ground Support Equipment Design |
| | |
4.6-4.6-3 |
Assess Space Vehicle Ground Support Equipment Verification Planning |
| | |
4.6-4.6-4 |
Assess Space Vehicle Ground Support Equipment Analyses |
| | |
4.6-4.6-5 |
Assess Space Vehicle Ground Support Equipment Manufacturing and Build |
| | |
4.6-4.6-6 |
Assess Space Vehicle Ground Support Equipment Interfaces |
| | |
4.6-4.6-7 |
Assess Space Vehicle Ground Support Equipment Integration and Test Planning |
| | |
4.6-4.6-8 |
Assess Space Vehicle Ground Support Equipment Verification Execution and Results |
| | |
4.6-4.6-9 |
Assess Space Vehicle Ground Support Equipment Operational Readiness |
|
4.7 |
Space Operations |
| | |
4.7-4.7-1 |
Assess Segment Operational Requirements |
| | |
4.7-4.7-2 |
Assess Space Segment Operational Procedures |
|
4.8 |
Launch System Integration |
| | |
4.8-4.8-1 |
Assess LSI Risk Identification and Management |
| | |
4.8-4.8-2 |
Assess LSI Requirements Definition |
| | |
4.8-4.8-3 |
Assess LSI Planning |
| | |
4.8-4.8-4 |
Assess LSI Design and Analysis |
| | |
4.8-4.8-5 |
Assess LSI Verification |
| | |
4.8-4.8-6 |
Assess Launch Base Operational Readiness and Execution |
|
4.9 |
Space Vehicle Storage |
| | |
4.9-4.9-1 |
Assess Space Vehicle Storage Requirements |
| | |
4.9-4.9-2 |
Assess Space Vehicle Storage Planning |
| | |
4.9-4.9-3 |
Assess Space Vehicle Storage Analyses |
| | |
4.9-4.9-4 |
Assess Space Vehicle Removal and Testing |
5 |
Ground Segment |
|
5.1 |
Ground Segment Program Planning & Management |
| | |
5.1-5.1-1 |
Assess Ground Segment Program Assurance |
|
5.2 |
Ground Segment System Engineering, Integration & Test (SEIT) |
| | |
5.2-5.2-2 |
Assess Ground Segment Risk Identification and Management |
| | |
5.2-5.2-3 |
Assess Ground Segment Requirements Definition |
| | |
5.2-5.2-4 |
Assess Ground Segment Design |
| | |
5.2-5.2-5 |
Assess Ground Segment Architecture |
| | |
5.2-5.2-6 |
Assess Ground Segment Analysis |
| | |
5.2-5.2-7 |
Assess Ground Segment Integration and Qualification Test Planning |
| | |
5.2-5.2-8 |
Assess Ground Segment Integration and Qualification Testing |
| | |
5.2.2 |
Ground Segment Supportability |
| | | |
5.2.2-5.2.2-1 |
Assess Ground Segment Supportability Program Assurance |
| | | |
5.2.2-5.2.2-2 |
Assess Ground Segment Supportability Risk Identification and Management |
| | | |
5.2.2-5.2.2-3 |
Assess Ground Segment Supportability Requirements |
| | | |
5.2.2-5.2.2-4 |
Assess Ground Segment Supportability Analysis |
| | | |
5.2.2-5.2.2-5 |
Assess Ground Segment Supportability Design |
|
5.4 |
Ground Segment Software |
| | |
5.4-5.4-1 |
Assess Ground Segment Software Requirements |
| | |
5.4-5.4-2 |
Assess Ground Segment Software Architecture |
| | |
5.4-5.4-3 |
Assess Ground Segment Software Design |
| | |
5.4-5.4-4 |
Assess Ground Segment Software Analysis |
| | |
5.4-5.4-5 |
Assess Ground Segment Software Implementation and Unit Test |
| | |
5.4-5.4-6 |
Assess Ground Segment Software Integration and Qualification Testing |
|
5.5 |
Ground Segment Hardware |
| | |
5.5-5.5-1 |
Assess Ground Segment Hardware Requirements |
| | |
5.5-5.5-2 |
Assess Ground Segment Hardware Architecture |
| | |
5.5-5.5-3 |
Assess Ground Segment Hardware Design |
| | |
5.5-5.5-4 |
Assess Ground Segment Hardware Analysis |
| | |
5.5-5.5-5 |
Assess Ground Segment Manufacturing and Build |
| | |
5.5-5.5-6 |
Assess Ground Segment Hardware Integration and Test Planning |
| | |
5.5-5.5-7 |
Assess Ground Segment Integration, Test and Evaluation |
|
5.6 |
Ground Segment Facilities |
| | |
5.6-5.6-1 |
Assess Ground Segment Facilities Requirements |
| | |
5.6-5.6-2 |
Assess Ground Segment Facilities Architecture |
| | |
5.6-5.6-3 |
Assess Ground Segment Facilities Design |
| | |
5.6-5.6-4 |
Assess Ground Segment Facilities Analysis |
| | |
5.6-5.6-5 |
Assess Ground Segment Facilities Integration and Test Planning |
| | |
5.6-5.6-6 |
Assess Ground Segment Facilities Integration and Test |
6 |
Launch Segment (Future Work) |
7 |
User Segment |
|
7.1 |
User Segment Program Planning & Management |
| | |
7.1-7.1-1 |
Assess Spectrum Planning and Allocation |
|
7.2 |
User Segment Systems Engineering |
|
7.3 |
User Segment Integration & Test |
8 |
Operations |
|
8-1 |
Assess Impacts of Operational Concepts and Implementation |
|
8-2 |
Assess Requirements in Terms of Operational Implementation |
|
8-3 |
Assess Security Requirements for Operational Implementation |
|
8-4 |
Assess Simulation Effectiveness and Certification |
|
8-5 |
Assess Operational Involvement in Flight/Ground Software Integration and Test |
|
8-6 |
Assess Site Activation and Transition Plans |
|
8-7 |
Assess Operations Schedule Integration and Executability |
|
8-8 |
Assess Communications Operations Readiness |
|
8-9 |
Assess Factory Tests and Reviews for Potential Operational Impacts |
|
8-10 |
Assess Operational Evaluation of Factory Support and Preparedness |
|
8-11 |
Assess Facility/Hardware/Software Maintenance Processes |
|
8-12 |
Assess Operations Configuration Control |
|
8-13 |
Assess System Functionality of Operational Sites |
|
8-14 |
Assess Operations Rehearsal Preparation and Execution |
|
8-15 |
Assess Operations Staffing and Training Preparedness |
|
8-16 |
Assess Operations Products |
|
8-17 |
Assess System Operability |
|
8-18 |
Assess System Reliability, Maintainability, and Availability During Operations |
|
8-19 |
Assess Operations Performance |
|
8-20 |
Assess On-Orbit Operations |
|
8-21 |
Assess Monitoring of Cybersecurity Controls in Operations |
|
8-22 |
Assess Monitoring of Application Security in Operations |
|
8-23 |
Assess Monitoring of Cyber Operating System Security in Operations |
|
8-24 |
Assess Monitoring of Cyber Network Security in Operations |
|
8-25 |
Assess Updates to Security Authorization Package |