4.4.4.4-4 Assess Structures Design |
Level 2 Tasks
|
Ensure the sufficiency of the conceptual, preliminary, and the detailed design of the system to perform the intended function through all operating conditions and throughout the design life.
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance chapter
|
4.4.4.4-5 Assess Structures Verification Planning |
Level 2 Tasks
|
Ensure plan and process are in place that proves the as-built item complies with the requirements baseline as determined by test, analysis, demonstration, inspection and/or similarity, performed at all levels from the lowest level configuration item to the system.
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Requirements Analysis and Verification Chapter
|
4.4.4.4-6 Assess Structures Analysis |
Level 2 Tasks
|
Ensure data evaluation is complete and conducted by accepted analytical techniques to determine that the item will meet specified requirements.
|
TOR-2011(8591)-2, Space Vehicle Test and Evaluation Handbook
|
4.4.4.4-7 Assess Structures Manufacturing and Build |
Level 2 Tasks
|
Ensure manufacturing and build processes produce items that meet the specified requirements and design. Ensure the design is accurately translated into a reliable, durable, manufactured/built item using processes that are highly repeatable and error free.
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Manufacturing Assurance chapter
|
4.4.4.4-10 Assess Structures Verification Execution and Results |
Level 2 Tasks
|
Ensure analysis, simulation, inspection, and test results provide evidence that the as-built system (including all interfaces) satisfies the requirements and specification baseline.
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B: Integration, Test and Evaluation chapter TOR-2011(8591)-2, Space Vehicle Test and Evaluation Handbook
|