1.1-2-1 Ensure evaluation of system concept and requirements |
Phase 0 |
|
Ensure the AoA assesses potential materiel solutions to satisfy the capability need documented in the approved Initial Capabilities Document. Ensure AoA focuses on identification and analysis of alternatives, measure of effectiveness, cost, schedule, concepts of operations, and overall risk.
|
NA
|
System CONOPS; Analysis of Alternatives (AoA) and Material Development Decision Products
|
Pre-Milestone A and Early-Phase Systems Engineering, Air Force Studies Board, National Research Council, 2008; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Program Assurance chapter
|
1.1-2-2 Ensure analysis of alternative concept designs are conducted |
Phase 0 |
|
Ensure at least two alternatives are considered. Ensure AoA assesses critical technology elements associated with each proposed materiel solution, including technology maturity, integration risk, manufacturing feasibility, and where necessary technology maturation and demonstration needs. Ensure AoA is updated, revalidated and approved prior to each program milestone.
|
AFMAN 63-119 A3.1; AFMAN 63-119 A3.2
|
Analysis of Alternatives (AoA) and Material Development Decision Products
|
Pre-Milestone A and Early-Phase Systems Engineering, Air Force Studies Board, National Research Council, 2008; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Program Assurance chapter; AFMAN 63-119 or equivalent
|
1.1-2-3 Ensure interface risk and impacts on other systems and architectures is evaluated |
Phase 0 |
|
NA
|
NA
|
External ICDs
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Program Assurance chapter
|