| Tasks | Applicable Mission Phases | Description | SFWC | Artifacts | References |
|---|---|---|---|---|---|
| 1.2.1.1-5-1 Ensure the system concept relative to the allocated spectrum is adequate | Phase 0 | Phase A | | Ensure the system concept relative to the allocated spectrum to specific service being considered. Ensure there is adequate spectrum available for the designated allocation to support the communication links being considered. | NA | System CONOPS | NA |
| 1.2.1.1-5-2 Ensure appropriate filings (Stage 1, and Stage 2) are submitted | Phase 0 | Phase A | | Ensure preliminary filing, Stage 1, is submitted during pre-phase A activities, and that Stage 2 submittal is filed at the end of Phase A. | NA | NA | NA |