1.2.1.1 - Program Requirements Planning

1.2.1.1-7 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
1.2.1.1-7-1 Ensure a documented test & evaluation strategy is approved prior to phase A Phase 0 | Ensure concepts for tests and evaluations are described for the program life cycle NA Capability Development Document (CDD) Defense Acquisition Guidebook online.
1.2.1.1-7-2 Ensure the test and evaluation strategy is consistent with the technology development strategy and the initial capabilities document Phase 0 | Ensure the strategy addresses the identification and management of technology risk, the evaluation of system design concepts against the preliminary mission and sustainment requirements resulting from the analysis of alternative, competitive prototyping, early demonstration of technologies in relevant environments, and the development of an integrated test approach. The strategy should also satisfy the statutory requirements for a technology development strategy test plan to ensure that the goals and exit criteria for the technology demonstrations are met. NA Capability Development Document (CDD); Initial Capabilities Document (ICD) Defense Acquisition Guidebook online.
1.2.1.1-7-3 Ensure the strategy includes applicable budgetary estimates and operational test objectives Phase 0 | Ensure test objectives are integrated into a test strategy that maximizes efficiencies during test execution while minimizing test resource requirements NA Capability Development Document (CDD) Defense Acquisition Guidebook online.
1.2.1.1-7-4 Ensure the strategy identifies and describes technical design risks Phase 0 | Ensure technological capabilities and limitations of alternative concepts and design options are considered to support cost-performance trade offs. Ensure an assessment is performed of the technical progress and maturity against critical technical parameters, including interoperability. NA Capability Development Document (CDD) Defense Acquisition Guidebook online.
1.2.1.1-7-5 Ensure modeling and simulation requirements are linked to capabilities through the entire test program, funded, and captured and tracked in appropriate plans Phase A | Phase B | Phase C | Phase D1 | Ensure current and archived modeling and simulation tools are considered for use on the program. Ensure models and simulation support plans address continuing ownership and maintenance after system fielding. Ensure external interfaces and interoperable systems with models and simulations are addressed. Ensure archived and legacy tools are considered before building new models and simulation tools. Ensure data and models are obtained from required authoritative resources. AFMAN 63-119 A17.1; AFMAN 63-119 A17.2; AFMAN 63-119 A17.2.1; AFMAN 63-119 A17.2.2; AFMAN 63-119 A17.2.3; AFMAN 63-119 A17.2.4; AFMAN 63-119 A17.2.5 NA AFMAN 63-119 or equivalent; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Requirements Analysis and Validation Chapter