1.3.1-4-1 Ensure acquisition strategy conformance to best practices and consistency with indicated resources including funding and schedule |
Phase 0 |
Phase A |
|
Ensure Use of historic program data to verify adequacy of resources. Ensure evaluation of launch vehicle and mission unique integration services are procured (GFE or not). Ensure customer operating and enabling concepts exists in the Master Capability Library. Ensure consistency of Integrated Planning Process (IPP) products with program plans. Ensure early operational test organization involvement when developing the acquisition strategy to plan for needed support. Ensure sufficient and timely research/development funding and procurement appropriations are programmed during each budget cycle to keep the program in technical balance. Ensure the requirements strategy (as reflected in the ICD and draft CDD) and acquisition strategy with regard to testing are fully supported (manpower, funding, test infrastructure, M&S).
|
AFMAN 63-119 A2.1; AFMAN 63-119 A2.4; AFMAN 63-119 A10.4.2; AFMAN 63-119 A10.8
|
NA
|
AFI 63-101 or equivalent; AFMAN 63-119 or equivalent; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Program Assurance Chapter
|
1.3.1-4-2 Ensure capabilities-based planning is conducted by the customer |
Phase 0 |
|
Ensure results of Previous Capabilities-Based Planning (CBP) are considered. Ensure Joint and customer Strategic Guidance is incorporated.
|
NA
|
Capability Development Document (CDD)
|
AFI 63-101 or equivalent
|
1.3.1-4-3 Ensure consistency of Integrated Planning Process (IPP) products with program plans |
Phase 0 |
Phase A |
|
Ensure Functional Area Analysis, Functional Needs Analysis, Functional Solutions Analysis, and Integrated Investment Analysis are consistent.
|
NA
|
Integrated Planning Process (IPP) Products
|
AFI 63-101 or equivalent
|
1.3.1-4-4 Ensure system concept and supporting analyses are consistent with acquisition strategy objectives |
Phase 0 |
Phase A |
|
Ensure system concept is sufficiently defined and clear. Ensure acquisition strategy (objectives) contains high-level threads for inclusion of operations concepts.
|
NA
|
System CONOPS
|
NA
|