1.3.2 - RFP Development

1.3.2-3 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
1.3.2-3-1 Ensure mission assurance/ recommended standards and specifications implemented as compliance documents Phase 0 | Phase A | Ensure compliance documents are appropriate to the acquisition strategy and risk posture. Recommended specifications and standards (contamination, power, EMI/EMC, reliability, risk, software engineering, etc.) can be found in the Mission Assurance Portal. NA Request for Proposal (RFP); Statement of Work (SOW); Mission Assurance Plan (MAP) Mission Assurance Guide, TOR-2007(8546)-6018, Rev B A3-1 , Space Vehicle Systems Engineering Handbook (TOR-2006(8506)-4494), Mission Risk Planning and Acquisition Tailoring Guidelines for National Security Space Vehicles, TOR -2011(8591)-5
1.3.2-3-2 Ensure tailoring of compliance documents is consistent with acquisition strategy and the program risk posture Phase 0 | Phase A | Ensure program specific tailoring of design verification and test standards, parts and materials, EMC, Cybersecurity, reliability, and software development, as well as others. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B A3-1, Space Vehicle Systems Engineering Handbook (TOR-2006(8506)-4494), Mission Risk Planning and Acquisition Tailoring Guidelines for National Security Space Vehicles, TOR-2011(8591)-5
1.3.2-3-3 Ensure that the Mission Critical Fault Analysis is included in the request for proposal package Phase A | MCFA provides a mechanism for identifying mission risk using operational timeline to identify mission-critical events and transitions. The MCFA determines the fault paths and flaws that could prevent success for each of these critical events. NA Request for Proposal (RFP) Test Like You Fly Process Guide for Space, Launch, and Ground Systems, TOR-2014-02537 Rev A, September 2016. (Section 4.3); TLYF
1.3.2-3-4 Ensure Test Like You Fly Process tasks and artifacts are included in the request for proposal package and contract Phase A | Sufficient funds, resources and schedule need to be committed to the program to commensurate with the risk policy adopted for the program. NA Request for Proposal (RFP); Integrated Master Plan (IMP) Test Like You Fly Process Guide for Space, Launch, and Ground Systems, TOR-2014-02537 Rev A, September 2016; TLYF