2.1.1 - Program Assurance

2.1.1-3 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.1.1-3-1 Ensure government furnished equipment verification criteria and responsibilities are evaluated Phase A | Phase B | Phase C | Ensure criteria can be verified, and responsible organizations are agreed upon for replacement of equipment that fails testing. NA Systems Engineering Management Plan (SEMP); Verification Cross-Reference Matrix (VCRM) Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494, Chapter 2
2.1.1-3-2 Ensure adequacy of government furnished equipment repair and retest criteria are assessed Phase A | Phase B | Phase C | Ensure criteria can be verified, and responsible organizations are agreed upon for replacement of equipment that fails testing. NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494, Chapter 2
2.1.1-3-3 Ensure adequate planning for On-Time Delivery and integration of Government Furnished Equipment Phase B | Phase C | Phase D1 | Ensure special watch list tracking for (a) GFE delivery item on critical path; (b) GFE delivery significantly behind schedule. Ensure a mitigation plan is initiated to reduce program impacts. NA Integrated Master Schedule (IMS) Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494, Chapter 2