2.1.4 - Program Configuration Management/Data Management

2.1.4-3 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.1.4-3-1 Ensure Functional Configuration Audit Process is assessed Phase C | Phase D1 | Ensure Functional Configuration Audit (FCA) /Physical Configuration Audit (PCA) are planned and completed for each unit/element in the system. Ensure FCA formally examines the functional characteristics of the configuration item, prior to acceptance, to verify that the item has achieved the requirements specified in its functional and allocated configuration documentation. NA Configuration Management/Audit Processes and Products Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B; EIA IS-649, National Consensus Standard for Configuration Management; MilStd-973 SMC Standard SMC-S-002, Configuration Management or equivalent