2.1.5 - Program Quality Management

2.1.5-18 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.1.5-18-1 Ensure verification of requirements flow-down for this unit Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-2 Ensure assessment of the verification methodology employed for this unit Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-3 Ensure assessment of adherence to specification & standards Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-4 Ensure assessment of TLYF compliance Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-5 Ensure assessment of the test plans, procedures, and reports Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-6 Ensure assessment of the pedigree reviews Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-7 Ensure assessment of the PDR Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-8 Ensure assessment of the CDR Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-9 Ensure assessment of the Qualification Tests Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-10 Ensure assessment of the Acceptance Tests Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-11 Ensure assessment of the Manufacturing Readiness Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-12 Ensure assessment of the Analyses Performed on this Unit Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-13 Ensure Class I Changes are assessed Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-14 Ensure assessment of the Class II Changes Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-15 Ensure assessment of the Material Review Board Actions Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-16 Ensure assessment of the Failure Review Board actions Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-17 Ensure assessment of the disposition of post integration and test Issues Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-18 Ensure assessment of the drawings Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-19 Ensure assessment of the overall Design Adequacy Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-20 Ensure overall test adequacy Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A
2.1.5-18-21 Ensure assessment of the overall build adequacy Phase D1 | NA NA NA Space System Verification Program and Management Process, TOR-2006(8506)-4732 REV. A