2.1.5-3-1 Ensure the quality management system complies with contractual requirements |
Phase A |
Phase B |
Phase C |
|
Ensure contractor quality management system complies to contract requirements and or applicable best practices (e.g. AS9100, ISO 9001:2008, etc.). Ensure review of quality assurance policies to verify compliance.
|
NA
|
Program Management Plan; Quality Assurance Plan, Processes and Products
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Quality Assurance Chapter
|
2.1.5-3-2 Ensure quality requirements in the design are evaluated |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure product designs will be reviewed for producibility, inspectability, configuration changes after design is frozen, and ability to verify conformance to design requirements, including acceptance requirements. Verification of this requirement may continue through manufacturing readiness review (MRR).
|
NA
|
Design Review Data Package; Verification Cross-Reference Matrix (VCRM)
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.
|
2.1.5-3-3 Ensure the quality assurance processes at proposed manufacturing facilities are evaluated |
Phase A |
Phase B |
Phase C |
|
Ensure quality assurance processes in place from PDR to CDR. Ensure the contractor's capability to flow down QA requirements to the supplier. Ensure processes are in place for the review of drawings, parts lists, manufacturing plans, travelers, work orders, Electro Static Discharge procedures, care and handling procedures, control of flight hardware/software and packaging/shipping procedures. Ensure plan recognized at SRR, with preliminary at PDR, final at CDR.
|
NA
|
Quality Assurance Plan, Processes and Products
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.
|
2.1.5-3-4 Ensure contractor's program quality plan is evaluated |
Phase A |
Phase B |
Phase C |
Phase D1 |
Phase D2 |
|
Ensure quality assurance processes are in effect from fabrication through fielding: Ensure that the mission assurance standards implementation defines charters for contractor's Configuration Control Board (CCB), Material Review Board (MRB), Failure Review Board (FRB), Corrective Action Board (CAB), and Preventive CAB (PCAB) actions. Ensure contractor's processes include conducting audit activities related to manufacturing such as Functional Configuration Audit (FCA) /Physical Configuration Audit (PCA) on first articles and Product Verification Reviews. Ensure effectiveness of MA processes are verified through the use of internal audits. Ensure plan is created at SRR, finalized at PDR, and updated as required at CDR.
|
NA
|
Quality Assurance Plan, Processes and Products
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.
|