2.1.5 - Program Quality Management

2.1.5-5 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.1.5-5-1 Ensure the contractor's capability to flow-down quality requirements to the supplier through the purchasing process Phase B | Phase C | Phase D1 | Ensure that manufacturing quality requirements are flowed by the contractor to the lowest level (part supplier). Ensure contractor, subcontractor, and part/component vendor manufacturing follows MA standards. Ensure that the following is addressed in the flow-down: manufacturing and test management, process control, process maturity, supply chain management and process control, including preventing the use of counterfeit parts as well as provisions for using foreign suppliers. Ensure flow-down of authority, if any, for MRB and FRB is clear. NA System/Segment Specification (SSS); Configuration Item (Hardware, Software and Firmware) Requirements Specifications; System Requirements Allocation Matrix Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.
2.1.5-5-2 Ensure adequacy of the contractor's supplier quality control plan Phase B | Phase C | Phase D1 | Ensure the contractor reviews suppliers on a periodic basis and uses a supplier rating system with a demonstrated effective approach to the rating of suppliers. Ensure that program supplier oversight is not compromised by any corporate unified approach to supplier management. NA Program Management Plan; Quality Assurance Plan, Processes and Products Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.
2.1.5-5-3 Ensure that independent audits are conducted as needed to verify that manufacturing management and processes are being flowed to suppliers Phase B | Phase C | Phase D1 | Ensure audits follow a prescribed schedule and that provision is are made to audit suppliers when evidence indicates a failure in supplier quality assurance processes. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.