2.1.5-6-1 Ensure the specification flow-down of quality requirements is evaluated |
Phase B |
Phase C |
Phase D1 |
|
Ensure quality assurance requirements established in Phase A flow-down to subcontractors and suppliers. Performance evaluation over the life cycle of the system.
|
NA
|
System Requirements Allocation Matrix; System/Segment Specification (SSS)
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.
|