2.1.5-8-1 Ensure the contractor's quality management system includes the quality elements required to deliver product that satisfies the customer's requirements |
Phase C |
|
Ensure Critical Design Review evaluation items includes assessment of the contractor's capability to flow-down QA requirements to the supplier. Ensure plan recognized at SRR, with preliminary at PDR, final at CDR.
|
NA
|
Program Management Plan; Quality Assurance Plan, Processes and Products
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Rev B, Quality Assurance Chapter; Quality Assurance Requirements for Space and Launch Vehicles, TOR-2005(8583)-3859.
|