2.2.2 - Design Assurance

2.2.2-1 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.2.2-1-1 Ensure the system design has the capability to meet operational requirements Phase 0 | Phase A | Phase B | Phase C | Ensure operational requirements are stated in terms which can be verified. Ensure design is detailed enough to be evaluated for capabilities. AFMAN 63-119 A4.4 NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance Chapter; AFMAN 63-119 or equivalent
2.2.2-1-2 Ensure the system design is evaluated relative to key performance parameters and technical performance measures Phase 0 | Phase A | Phase B | Phase C | Ensure the design is evaluated relative to Key Performance Parameters (KPP) and Technical Performance Measures (TPM). NA Design Review Data Package; Key Performance Parameters (KPP); System TPMs Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance Chapter
2.2.2-1-3 Ensure system design effectiveness is evaluated relative to system design margins Phase A | Phase B | Phase C | Ensure design margins are specified and maintained for use in trades between performance, cost and schedule. NA Design Review Data Package Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance Chapter
2.2.2-1-4 Ensure system design is assessed relative to transportation & handling equipment Phase B | Phase C | Ensure transportation and handling requirements are reviewed whenever changes to system design are considered. NA Design Review Data Package Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance Chapter
2.2.2-1-5 Ensure system design is assessed relative to launch vehicle/space vehicle assembly, erection and mating systems Phase B | Phase C | Ensure assembly, erection and mating systems are reviewed whenever changes to system design are considered. NA Design Review Data Package Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance Chapter
2.2.2-1-6 Ensure payload design/drawing is compatible with system design Phase B | Phase C | Ensure payload designs are reviewed whenever changes to system design are considered. NA Design Review Data Package Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance Chapter
2.2.2-1-7 Ensure system design is assessed relative to mission modifications Phase B | Phase C | Ensure system, segment and subsystem designs are reviewed whenever changes to system design are considered. NA Design Review Data Package Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Design Assurance Chapter