2.2.3-3-1 Ensure suitability of contractor factory metrics is evaluated |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
NA
|
NA
|
NA
|
MIL-STD-1528A, Production Management, Sept 1, 1986; TOR-2006(8506)-4494, Space Vehicle System Engineering Handbook, Manufacturing and Production chapter
|
2.2.3-3-2 Ensure variability reduction studies are reviewed |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
NA
|
NA
|
NA
|
MIL-STD-1528A, Production Management, Sept 1, 1986; TOR-2006(8506)-4494, Space Vehicle System Engineering Handbook, Manufacturing and Production chapter
|
2.2.3-3-3 Ensure process improvement programs are evaluated |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
NA
|
NA
|
NA
|
MIL-STD-1528A, Production Management, Sept 1, 1986; TOR-2006(8506)-4494, Space Vehicle System Engineering Handbook, Manufacturing and Production chapter
|
2.2.3-3-4 Ensure evaluation of the process capability calculations |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
NA
|
NA
|
NA
|
MIL-STD-1528A, Production Management, Sept 1, 1986; TOR-2006(8506)-4494, Space Vehicle System Engineering Handbook, Manufacturing and Production chapter
|
2.2.3-3-5 Ensure non-conformance/defect metrics are tracked and dispositioned |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
NA
|
NA
|
NA
|
MIL-STD-1528A, Production Management, Sept 1, 1986; TOR-2006(8506)-4494, Space Vehicle System Engineering Handbook, Manufacturing and Production chapter
|
2.2.3-3-6 Ensure product design completed, is producible, and meets performance requirements |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
NA
|
SFWC 2.1.3.1.7
|
NA
|
NA
|
2.2.3-3-7 Ensure contractor processes to evaluate product discrepancies are proven and applied (including vendors and subcontractors) |
Phase C |
Phase D1 |
|
NA
|
SFWC 2.3.1.2
|
NA
|
NA
|