2.2.8-3-1 Ensure plan for post flight data analysis and review is complete |
Phase B |
Phase C |
Phase D1 |
Phase D2 |
Phase D3 |
|
Ensure the Post flight Analysis and reviews completed within 60 days (includes launch vehicle, spacecraft, and critical ground systems).
|
SFWC 4.17, SFWC 4.18
|
NA
|
NA
|
2.2.8-3-2 Ensure post flight data analysis and review are complete |
Phase D2 |
|
Ensure the Post flight Analysis and reviews completed within 60 days (includes launch vehicle, spacecraft, and critical ground systems).
|
SFWC 4.17, SFWC 4.19
|
NA
|
NA
|
2.2.8-3-3 Ensure redlines and "lessons-learned" reviewed and are placed into procedure review process for next cycle |
Phase D2 |
|
Ensure the Post flight Analysis and reviews completed within 60 days (includes launch vehicle, spacecraft, and critical ground systems).
|
SFWC 4.17, SFWC 4.20
|
NA
|
NA
|