2.3.10-1-1 Ensure systems plans and production process plans are coordinated and consistent with packaging, handling, storage & transportability activities to provide integrated logistic support |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure packaging, handling, storage and transportability requirements are organized and managed with the applicable functional organizations to include: design interfaces, maintenance planning, support equipment, supply support, technical data, facilities, training, computer resource support, manpower and personnel.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-2 Ensure review of policy and responsibility to provide requirements, instructions, and guidelines for the application of transportability engineering is documented |
Phase 0 |
Phase A |
Phase B |
|
Ensure transportability is consideration in the design of hardware at the equipment, bus, payload and space vehicle level. Conditions that impose transportability constraints should identified early in the design phase, and appropriate methods, procedures, and equipment should be used to assure that products can be moved or shipped without degradation and without injury to handling personnel.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-3 Ensure program control of resources in place |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure scheduling permits the performing activity and the requiring authority program review of status consistent with end item development, test, production, and delivery schedules. Evaluate time phasing and program interfaces to establish clear interfacial relationships.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-4 Ensure Contractual Requirements, Terms and Conditions Exist for Packaging, Handling, Storage & Transportability |
Phase A |
Phase B |
|
Ensure packaging, handling, storage and transportability engineering technical and cost inputs are included in all proposals submitted when appropriate to the type of proposal. Packaging, handling, and transportability engineering activities should be considered and provided for in all applicable programs or projects.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-5 Ensure compliance to all preservation, packaging and marking requirements |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure packaging is in conformance to government and military specifications or requirements to include: Quantity; preservation and packing materials; packing; and marking. Packaging requirements should address all potential conditions of shipment under procurement: system, subsystem, equipment, assembly, part, material, process and finish, packaging. Commercial packaging should consider as the minimum requirements and considerations: cleanliness, preservation, cushioning, containers, container marking, and cost effectiveness.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-6 Ensure requirements established regarding the quality of packaging, handling and storage methods |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure effort is directed toward implementation of the best-known packaging, handling, and storage methods with the contractors and host transportation offices, using packaging materials and container types best suited for durability and product protections. Preservation of quality implies the use of handling, storage, and packaging criteria previously tested, applied and proved.
|
AFMAN 63-119 A28.4
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment; AFMAN 63-119 or equivalent
|
2.3.10-1-7 Ensure supplier packaging requirements in place |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure requirements in place for items procured are adequately protected during shipment to the contractor and during subsequent handling, processing and storage.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-8 Ensure policy and procedures in place at contractor facility for effective hardware protection |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure all hardware is provided with appropriate protective measure to prevent physical and or environmental damage during in plant handling, transportation, and storage. Hardware protection requirements define protection methods and prepare material handling and storage procedures for assemblies, subassemblies and components during the manufacturing, assembly, test and integration cycle.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-9 Ensure appropriate resource allocation for the accomplishment of package, handling & transportability in place |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure resource allocation to include coordinated activities in place between packaging engineers, manufacturing planning, stores/warehousing, quality assurance and appropriate management and supervision in place to include training and instruction of personnel. Ensure an adequate quantity of shipping containers.
|
AFMAN 63-119 A28.2
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment; AFMAN 63-119 or equivalent
|
2.3.10-1-10 Ensure packaging and handling of hazardous materials is consistent with federal, state and local regulations |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure hazardous materials include items such as explosives, flammables, corrosives, compressed gases, poisons, another materials. Regulations found in Title 49 of the Code of Federal Regulations.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment; Title 49 of the Code of Federal Regulations
|
2.3.10-1-11 Ensure methods to identify packaging design and performance deficiencies and initiating proper corrective action are provided |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure analysis of system, subsystem, assemblies, subassemblies and components design criteria to determine fragility levels and environmental sensitive characteristics incidental to packaging, transportation and storage. Package drawings should contain all information necessary to fabricate special shipping containers and the peculiar application of cushioning, blocking, bracing or tie down of the items.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-12 Ensure classified material packaged in accordance with applicable requirements |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure the appropriate security organization provides specific packaging requirements for a particular shipment based on the classification of material, the mode of transportation, and the particular customer security requirements.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-13 Ensure evaluation of packaging requirements and associated procedures for electrostatic sensitive parts |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure parts and assemblies which may be damaged by electrostatic discharge are provided with protection from such damaging static discharge to the greatest extent possible or practicable.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-14 Ensure handling, & transportability documentation completed and all changes are controlled and understood |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure effective program performance by assuring preparation, coordination, release, and maintenance of handling, and transportability data reports, plans and other documentation.
|
NA
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment
|
2.3.10-1-15 Ensure packaging for shipment is compliant with requirements |
Phase D1 |
|
Ensure material shipped is preserved, packaged, packed, and marked in order to meet all contractual and legal requirements and to provide protection to such material so that potential for damage or degradation is minimized. Space vehicle shipping container needs to control and monitor environment during shipment.
|
AFMAN 63-119 A28.1
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment; AFMAN 63-119 or equivalent
|
2.3.10-1-16 Ensure methods for coordination and interface between activities affecting packaging, handling, storage & transportability are provided |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure plan in place to coordinate handling and transportation activities to ensure that project requirements are maintained. Ensure formal or preliminary technical data are verified and available to the launch site.
|
AFMAN 63-119 A28.3
|
NA
|
MIL-STD-1367A, Packaging, Handling, Storage, and Transportability Program Requirements for Systems and Equipment; AFMAN 63-119 or equivalent
|