2.3.10-2-1 Ensure logistics support analyses performed |
Phase B |
Phase C |
|
For SMC programs, ensure the Integrated Logistics Support Plan includes the 10 elements in integrated logistics support section of SMC Systems Engineering Primer and Handbook.
|
SFWC 2.1.3.1.6
|
NA
|
NA
|
2.3.10-2-2 Ensure logistics support concepts describe optimal system maintenance strategies and methods based on system requirements |
Phase A |
Phase B |
Phase C |
|
Ensure the logistics support concepts include acceptable service and/or contractor mixes to address optimal maintenance strategies and methods. The concepts should identify high-risk areas such as long lead items, technical orders and support equipment. The system's design should address all constraints identified in the support concepts.
|
AFMAN 63-119 A8.1; AFMAN 63-119 A8.1.1; AFMAN 63-119 A8.1.2
|
NA
|
AFMAN 63-119 or equivalent; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations Readiness Assurance Chapter
|
2.3.10-2-3 Ensure logistics support criteria are flowed down to measures of effectiveness and performance, and are contained in the operational test plans |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure logistics concepts are linked to Measures of Effectiveness (MOEs) and Measures of Performance (MOPs) in the operational test concepts/plans. Logistics support strategies and plans must be sufficiently detailed to support early development of operational test concepts/plans. Suitability test scenarios must be included in test planning, and be developed from support concepts and operational concepts.
|
AFMAN 63-119 A8.2; AFMAN 63-119 A8.3; AFMAN 63-119 A8.4; AFMAN 63-119 A22.3.3
|
NA
|
AFMAN 63-119 or equivalent; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Integration, Test, and Evaluation Chapter
|
2.3.10-2-4 Ensure logistics plans cover the program lifecycle, from operational test through replacements and new acquisitions |
Phase B |
Phase C |
Phase D1 |
|
Ensure developmental and operational testing are supported using the logistics plans, and that those plans were developed and updated from operational requirements and concepts of operations. Ensure the system's design addresses logistics constraints. Ensure repair actions are sufficient to support operations. Ensure development of maintainability and reliability growth plans and lifecycle management plans for operations.
|
AFMAN 63-119 A8.5; AFMAN 63-119 A8.6; AFMAN 63-119 A8.7; AFMAN 63-119 A8.8; AFMAN 63-119 A8.9; AFMAN 63-119 A8.10; AFMAN 63-119 A26.5
|
NA
|
AFMAN 63-119 or equivalent; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations Readiness Assurance Chapter
|