2.3.14 - Human Factors Engineering

2.3.14-11 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.14-11-1 Ensure the system, both hardware and software, is designed and implemented to be maintained by the designated personnel with the specified skill levels Phase A | Phase B | Phase C | Ensure the designated maintenance and sustainment personnel have the specified skill levels to be able to maintain the system using defined procedures and resources for maintenance and repair. See related requirements on Inherent Availability, Achieved Availability, Operational Availability, Mean Logistics Delay Time, Mean Time Between Failure, Mean Time to Repair, and Mean Time Between Maintenance. Applies to HW, SW, and SE across Ground, Space, User and Factory. NA NA SMC Human Systems Integration (HSI) Policy, 12 Feb 2006 or equivalent; United States Air Force (2009) Human Systems Integration Requirements Pocket Guide, U.S. Air Force Human Systems Integration Office, September 2009; United States Air Force (2010) Air Force Instruction 10-601, Operational Capability Requirements Development, 12 July 2010; Defense Acquisition Guidebook, Chapter 6, 10 January 2012; Air Force Human Systems Integration Handbook (AFHSI) Handbook, Planning and Execution of Human Systems Integration, 21 Jan 2009