2.3.14 - Human Factors Engineering

2.3.14-13 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.14-13-1 Ensure the contractor human systems integration/human factors engineering test approach includes structured operator/maintainer/user review, rapid prototyping, and iterative design prior to formal testing Phase B | Phase C | Phase D1 | Ensure user reviews are conducted under as close to realistic environments as possible with representative operators/maintainers/users. Applies to HW, SW, and SE across Ground, Space and User . NA NA SMC Human Systems Integration (HSI) Policy, 12 Feb 2006 or equivalent; Defense Acquisition Guidebook, Chapter 6, 10 January 2012; Air Force Human Systems Integration Handbook (AFHSI) Handbook: Planning and Execution of Human Systems Integration, 21 Jan 2009; Gawron, V.J. (2000) Human Performance Measures Handbook, Lea Lawrence Erlbaum Associates, New Jersey; AIAA Guide to Human Performance Measurements (G-035A-2000e)
2.3.14-13-2 Ensure early operator, maintainer, and test organization involvement are included as part of the test program safety assessment activities Phase B | Phase C | Phase D1 | Ensure all Human Systems Integration safety risks are included as part of the Human Systems Integration operator/maintainer/user test readiness assessments as appropriate for the designated system. Applies to HW, SW, and SE across Ground, Space and User. Ensure operational test organizations independently examine technical and safety risks involving personnel and property prior to test. AFMAN 63-119 A23.7 NA SMC Human Systems Integration (HSI) Policy, 12 Feb 2006; Defense Acquisition Guidebook, Chapter 6, 10 January 2012; Air Force Human Systems Integration Handbook (AFHSI) Handbook: Planning and Execution of Human Systems Integration, 21 Jan 2009; Gawron, V.J. (2000) Human Performance Measures Handbook, Lea Lawrence Erlbaum Associates, New Jersey; AIAA Guide to Human Performance Measurements (G-035A-2000e); AFMAN 63-119 or equivalent