2.3.14 - Human Factors Engineering

2.3.14-14 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.14-14-1 Ensure that the human system integration and testing activities are complete, accurate and integrated with overall hardware, software and system engineering planned testing Phase D1 | Ensure testing activities include: an end-to-end usability/workload/human performance assessment with measurement at a minimum of cognitive workload, situation awareness and task performance; review of planned techniques to ensure they are in accordance with validated Human Factors Engineering/Human Systems Integration methods (such as those described in the AIAA Guide to Human Performance Measures); and a review of planned statistical techniques to ensure the appropriate statistical techniques are utilized in the analysis of results. This should include non parametric techniques as needed. All Human Systems Integration domains should be included as part of the Human Systems Integration human performance testing as appropriate for the designated system. Applies to HW, SW, and SE across Ground, Space and User . NA NA SMC Human Systems Integration (HSI) Policy, 12 Feb 2006 or equivalent; Gawron, V.J. (2000) Human Performance Measures Handbook, Lea Lawrence Erlbaum Associates, New Jersey; AIAA Guide to Human Performance Measurements (G-035A-2000e)