2.3.16 - Cables and Harnesses

2.3.16-10 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.16-10-1 Ensure all cable and harness manufacturing paper/travelers are complete Phase C | Phase D1 | Ensure all cable and harness manufacturing paper/travelers are complete with QA stamps for acceptance. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
2.3.16-10-2 Ensure all cable and harness testing is complete Phase D1 | Ensure all cable and harness test data are reviewed and complete with QA stamps for acceptance. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
2.3.16-10-3 Ensure the cable and harness verification ledger is complete Phase D1 | Ensure the cable and harness verification ledger is reviewed and complete. Ensure the verification method is consistent with the VCRM. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
2.3.16-10-4 Ensure all cable and harness End Item Data Packages (EIDP) are complete Phase D1 | Ensure all the cable and harness End Item Data Packages (EIDP) are reviewed and accepted with no open issues. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section