2.3.16-11-1 Ensure all cables and harnesses are inspected before final flight closure |
Phase D1 |
|
Ensure all connectors are mated. Ensure there is no damage to the cables and harnesses during integration and test. Ensure there are no sharp edges against any cables and harnesses. Ensure all cables and harnesses are properly and adequately mounted. Ensure all unnecessary test cables and harnesses have been removed. Ensure there are no unmated connectors.
|
NA
|
NA
|
TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
|
2.3.16-11-2 Ensure all cable and harness documentation is updated |
Phase D1 |
|
Ensure all cables and harnesses rework, repair, replacements during space vehicle assembly and test phase are properly documented and all discrepancies/issues closed. Ensure the top level cables and harnesses connectivity diagrams are updated to reflect the actual flight configuration.
|
NA
|
NA
|
TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
|