2.3.16 - Cables and Harnesses

2.3.16-3 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.16-3-1 Ensure contractor has specifications for all cable and harness elements Phase A | Phase B | Phase C | Ensure each cables and harnesses element has requirements captured in a specification. Ensure in the introduction or scope section of the specification states the applicable cables and harnesses elements. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
2.3.16-3-2 Ensure contractor has properly flowed down all cable and harness requirements Phase A | Phase B | Phase C | Ensure all applicable requirements are captured in cables and harnesses specifications. Sources for applicable requirements include but are not limited to: all other specification (System Specification, Vehicle Specification, Subsystem Specification, Unit Specifications, etc.), interface documents and drawings, control plans (PM&P, Contamination, EMI/EMC, etc.), compliance documents, corporate standards, etc. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
2.3.16-3-3 Ensure all cable and harness specifications are complete by CDR Phase C | Ensure all cable and harness specifications are completed, released, and configuration controlled by CDR with no TBXs. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section