2.3.16 - Cables and Harnesses

2.3.16-8 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.16-8-1 Ensure all the cable and harness connectors are the correct type, clocking, and gender Phase B | Phase C | Phase D1 | Ensure all cable and harness interfaces are checked against the unit specification and interface documents/drawings. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
2.3.16-8-2 Ensure the cable and harness bundle diameters are within the real estate allocated Phase B | Phase C | Phase D1 | Ensure the size of the cables and harnesses have no interferences from the structure or units. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
2.3.16-8-3 Ensure adequate space for cable and harness bundle mounting Phase B | Phase C | Phase D1 | Ensure there are sufficient mounting brackets to secure the cables and harnesses. NA NA TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section