2.3.16-9-1 Ensure the cable and harness integration order is logical |
Phase B |
Phase C |
Phase D1 |
|
Ensure the installation of any item would not block access to the removal of another item. Ensure the installation procedure does not pose any risk of damaging the cables and harnesses (e.g. Pulling a harness through a mouse hole).
|
NA
|
NA
|
TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
|
2.3.16-9-2 Ensure all cables and harnesses paths are tested for proper function |
Phase B |
Phase C |
Phase D1 |
|
Ensure all cables and harnesses paths are tested after the final mate.
|
NA
|
NA
|
TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
|
2.3.16-9-3 Ensure all cable and harness test points are identified and accessible |
Phase B |
Phase C |
Phase D1 |
|
Ensure all cable and harness test points needed during space vehicle level testing are accessible.
|
NA
|
NA
|
TOR-2006(8506)-4494, Space Vehicle Systems Engineering Handbook, Electrical Power and Distribution chapter, Cabling section
|