2.3.17 - Dead Bus Recovery

2.3.17-5 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.17-5-1 Ensure the verification method(s) are correct and complete for each dead bus recovery requirement Phase B | Phase C | Phase D1 | Ensure the acceptable verification methods are Inspection, Analysis, Demonstration, test, and any combination(s) of the four. NA NA TOR-2006(8506)-4494
2.3.17-5-2 Ensure verification testing are performed at the proper level of integration and use the proper platform Phase B | Phase C | Phase D1 | Ensure testing and demonstration are performed using flight articles, engineering models, flight satellite, or test bed. NA NA TOR-2006(8506)-4494
2.3.17-5-3 Ensure verification plans and procedures meets the intent of the DBR requirements Phase B | Phase C | Phase D1 | Ensure verification plans and procedures are traceable to the DBR requirement(s). NA NA TOR-2006(8506)-4494