2.3.17 - Dead Bus Recovery

2.3.17-6 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.17-6-1 Ensure the verification results meet the intent of the DBR requirement Phase C | Phase D1 | Ensure the system level DBR capability verification is sufficiently specific. DBR demonstration might be different from normal satellite power up procedures. Satellite configuration in the non-volatile memory could very. NA NA TOR-2006(8506)-4494
2.3.17-6-2 Ensure the DBR verification results are documented Phase C | Phase D1 | Ensure DBR requirements verification documentation specifically addresses DBR. NA NA TOR-2006(8506)-4494