2.3.1 - System Safety

2.3.1-12 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.1-12-1 Ensure contractor system safety and health implementation is adequate to ensure protection of government interests Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure a hazard tracking process in place to monitor completion of mitigation measures. Ensure procedures in place to document and track hazards and their controls provided an audit trail of hazard resolutions. SFWC 1.1.3.4 NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Systems Safety Assurance chapter; Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494, System Safety chapter; Mil-Std-882 System Safety Program Requirements; SMCI-63-1205, The SMC System Safety Programs or equivalent