2.3.1 - System Safety

2.3.1-13 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.1-13-1 Ensure comprehensive post flight analysis review plan complete, verifies hazard mitigation methods were successful, and new hazards were identified Phase D2 | Ensure post flight analysis plan is complete and includes verification that hazard mitigation methods were successful and new hazards were identified. Ensure acceptability of problem/anomaly investigations, resolution, tracking and documentation; ensure hardware nonconformance resolution process. SFWC 1.1.3.5 NA AFSPCMAN 91-710, Range Safety User Requirements Manual