Tasks | Applicable Mission Phases | Description | SFWC | Artifacts | References |
---|---|---|---|---|---|
2.3.1-16-1 Ensure the risk is reduced to an acceptable level by use of mitigative and preventative approaches | Phase A | Phase B | Phase C | Phase D1 | | Ensure the risk is reduced to an acceptable level by use of preventative and mitigative approaches. Verify the risk reduction by use of appropriate analysis, testing or inspection is complete. | SFWC 2.10.1, SFWC 2.10.2 | NA | NA |