2.3.1 - System Safety

2.3.1-17 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.1-17-1 Ensure sufficiency of integration and requirements verification testing with respect to safety-related requirements Phase C | Phase D1 | Ensure that safety-related requirements will be tested on the integrated system, that they will be tested under stressing conditions, and that failure scenarios and recoveries are included in test scenarios AFMAN 63-119 A15.13.1 NA MIL STD 1629A Task 101, "Failure Modes and Effects Analysis", section 4.5.2 (Critical Item List, par. C), MIL STD 882C, Task 301"Safety Assessment", GEIA STD 009, Task 5.5.1.9 "Plan and Conduct Design Reliability Verification", 6.5.19 "Plan and Conduct Production Reliability Verification"; AFMAN 63-119 or equivalent