2.3.1 - System Safety

2.3.1-7 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.1-7-1 Ensure system safety is adequately addressed in the System Engineering Plan (SEP) and system engineering processes Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure the systems engineering plan details the safety policies and processes and appropriate references. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Systems Safety Assurance chapter; Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494, System Safety chapter, System Safety chapter; SMC Systems Engineering Development Guide or equivalent