2.3.2 - Reliability Maintainability Availability

2.3.2-11 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.2-11-1 Ensure Readiness Reviews (Pre-Ship, Flight, etc) are assessed for adequacy relative to reliability requirements compliance Phase D1 | Ensure that all reliability numerical requirements, critical item control plans and failure reports are complete with no open items NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Reliability Chapter; Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494, Reliability Engineering chapter