2.3.2 - Reliability Maintainability Availability

2.3.2-9 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.2-9-1 Ensure Environmental Stress Screening (ESS) process is adequate and complete Phase B | Phase C | Phase D1 | Ensure that workmanship failures are identified early. Ensure that the ESS program includes feedback of latent and intermittent failures, previously undetected design defects, previously undetected failure modes, and workmanship defects into the Failure Reporting Analysis and Corrective action system (FRACAS). Ensure results of ESS are incorporated into reliability predictions. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Reliability Chapter; Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494,Chapter 21; SMC-S-013, Reliability Program for Space Systems, 13 June 2008 (also published as TOR-2007(8583)-6889 under same title) or equivalent