2.3.3 - Parts Materials & Processes (PM&P)

2.3.3-6 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.3-6-1 Ensure analysis s of Electrical, Electronic, Electromagnetic and Electro-optical parts is completed at the start of build phase Phase C | Phase D1 | Ensure requirements compliance as specified in TOR-2006(8583)-5236. SFWC 2.3 NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter; Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; TOR-2006(8583)-5235 Rev A, Parts, Materials, and Processes Control Program for Space and Launch Vehicles; MIL-STD-1580D, Department of Defense Test Method Standard: Destructive Physical Analysis (DPA) for Electronic, Electromagnetic, and Electromechanical; TOR-2006(8583)-5236,Rev A, Technical Requirements for Electronic Parts, Materials & Processes Used in Space and Launch Vehicles