2.3.4 - Electrical Design Integration

2.3.4-4 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.4-4-1 Ensure any rework and re-test after hardware acceptance have been reviewed for adequacy Phase D1 | Ensure all rework and re-test are coordinated with manufacturing, QA and I&T. Ensure procedures are reviewed and approved. NA NA Space Vehicle Test and Evaluation Handbook, TOR-2011(8591)-2, Interconnect Hardware, Cables, and Connectors chapter; TOR-2008(8583)-8492, Wiring Harness, Space Vehicle, Design and Testing, General Specification for