2.3.8 - Contamination Control

2.3.8-1 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.8-1-1 Ensure evaluation of contamination sources & effects analysis Phase A | Phase B | Phase C | Ensure identification and itemization of all contamination sensitive system, subsystem and payload elements. NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494, 30 November 2005, Subsection 6.4, Contamination and Contamination Control
2.3.8-1-2 Ensure Contamination Control Plan is developed and implemented Phase A | Phase B | Phase C | Ensure the plan documents means of achieving and verifying cleanliness requirements derived in analysis. Ensure plans are generated for system, subsystem, and/or payload elements and are consistent with interface control document requirements. Contains as a minimum (per ASTM 1548-09): cleanliness requirements for deliverable hardware; implementation plans to achieve, verify and maintain specified cleanliness requirements; environmental controls for facilities to be used; and personnel and operational controls including operating procedures, restrictions, training, and organizational responsibilities for implementation and verification of the Plan. NA NA ASTM E1548-09, Standard Practice for Development of Aerospace Contamination Control Plans