2.3.9 - System Survivability

2.3.9-7 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
2.3.9-7-1 Ensure test results are documented in a program-wide parts database maintained by the prime contractor and available to sub-tier contractors Phase C | Phase D1 | Ensure the prime contractor keeps track of industry alerts, GIDEP alerts, and approved suppliers. The contractor identifies alternative suppliers and develops contingency plans for no-notice interruptions during production. SFWC 2.4.2.3.3 NA TOR-2006(8583)-5235 Rev A, Parts, Materials and Processes Control Program for Space and Launch Vehicles; TOR-2006(8583)-5236 Rev A Technical Requirements for Electronic Parts, Materials and Processes Used in Space and Launch Vehicles
2.3.9-7-2 Ensure engineering development tests are performed to reduce uncertainties and provide engineering data for the survivability design process Phase C | Phase D1 | Ensure the tests and test reports are complete in content and format to support the design evolution and government oversight. SFWC 2.4.2.3.3 NA NA