4.2 - Space Segment Systems Engineering

4.2-2 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.2-2-1 Ensure that all space system risks for cost, schedule, performance and technology are identified and have a mitigation plan Phase A | Phase B | Phase C | Phase D1 | Ensure risks are identified early and at the lowest level. Check that the risk mitigation plans are sufficient, risk handling measures are planned, funded, executed and completed at the right time. SFWC 4.5 NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B