Tasks | Applicable Mission Phases | Description | SFWC | Artifacts | References |
---|---|---|---|---|---|
4.4.4-2-1 Ensure that all subsystem risks for cost, schedule, performance, technology are identified and have a mitigation plan | Phase A | Phase B | Phase C | Phase D1 | | Ensure risks identified early and at the lowest level. Check that the risk mitigation plans are sufficient, risk handling measures planned, funded, executed and completed at the right time. | NA | NA | Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B |