4.4.4.4 - Structures

4.4.4.4-10 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.4.4.4-10-1 Ensure test execution and results, especially for composites and bonded structures, are evaluated Phase B | Phase C | Phase D1 | Ensure minimum proof test factors were achieved and the test configuration is flight like. Ensure all composite, bonded items and workmanship sensitive structures are proof tested. Evaluation of tag end samples strongly recommended for composite structures. NA NA Space Systems - Structures Design and Test Requirements (TOR-2003(8583)2894)