4.4.4.5-6-1 Ensure torque and/or force margin analyses under worst case conditions are performed |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure 100% static torque or force margin at any position of motion under worst case environmental conditions, including resistance from detent/backdrive torque. Ensure 25% dynamic torque or force margin at any position of motion; evaluate excess torque and whether detrimental to the design. Ensure torque margin requirements met before and after gearbox and/or harmonic drive train. Ensure wiring harness parameters affecting loop-torque & stiffness identified, controlled, & documented. Ensure 100% minimum retraction force margin at worst-case environmental conditions and tolerances for non-explosive pin pullers.
|
NA
|
NA
|
AIAA S-114-2005
|
4.4.4.5-6-2 Ensure motor analyses are performed |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Analyses should include step stability, backdrive torque/force margin, torque/force margin including back-Electro-Magnetic Field (EMF), and unpowered holding torque margin.
|
NA
|
NA
|
AIAA S-114-2005
|
4.4.4.5-6-3 Ensure end-of-travel stop/latch structural analysis is performed |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure a structural (static) yield factor of safety of at least 2.0 for maximum impact loads on mechanical stops or shoulders.
|
NA
|
NA
|
AIAA S-114-2005
|
4.4.4.5-6-4 Ensure bearing analyses are performed |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Bearing analyses should include contact stress, truncation, preload, Elastohydrodynamic (EHD) regime, and life.
|
NA
|
NA
|
AIAA S-114-2005
|
4.4.4.5-6-5 Ensure tolerance analyses are performed |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure that tolerances on all parts used in Moving Mechanical Assembly (MMA)s are established and analyzed to maintain adequate clearances under all environmentally-induced conditions.
|
NA
|
NA
|
AIAA S-114-2005
|
4.4.4.5-6-6 Ensure clearances within the Moving Mechanical Assembly (MMA), and between MMAs and other elements, are evaluated |
Phase A |
Phase B |
Phase C |
Phase D1 |
|
Ensure deployment clearance requirements (including fields of view/regard) are established and maintained. Ensure that attachment clamps, e.g., are used to prevent movement of harness into motion path. Ensure thermal blanket billowing and movement are included in the analysis.
|
NA
|
NA
|
AIAA S-114-2005
|