4.4.4.6 - Structural Dynamics

4.4.4.6-5 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.4.4.6-5-1 Ensure structural design verification approach is evaluated Phase B | Phase C | Ensure that mode survey testing is included as plan element and that test and model-correlation criteria are acceptable. NA NA Independent Structural Loads Analysis, SMC Standard SMC-S-004, 13 June 2008 or equivalent
4.4.4.6-5-2 Ensure dynamic model test verification plan is evaluated Phase B | Phase C | Ensure that process leads to adequate level of test verification of spacecraft dynamic model. Elements include independent certification of mode survey test results and verification of adequacy of SV contractor model correlation product. NA NA Independent Structural Loads Analysis, SMC Standard SMC-S-004, 13 June 2008 or equivalent