4.4.4.7 - Ordnance/Pyrotechnics

4.4.4.7-9 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.4.4.7-9-1 Ensure list of tests encompass all specification requirements Phase C | Phase D1 | PLACEHOLDER NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494
4.4.4.7-9-2 Ensure adequate threshold/margin tests are conducted Phase D1 | Ensure adequacy of margin verification methods. Margin verification methods for explosively actuated devices are detailed in AIAA S-113-2005. NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; AIAA S-113-2005, Criteria for Explosive Systems and Devices on Space and Launch Vehicles
4.4.4.7-9-3 Ensure functional test requirements are adequate Phase C | Phase D1 | PLACEHOLDER NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494