4.4.6 - Thermal Control Subsystem (TCS)

4.4.6-2 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.4.6-2-1 Ensure that all subsystem risks for cost, schedule, performance, technology are identified and have a mitigation plan Phase A | Phase B | Phase C | Phase D1 | Ensure risks identified early and at the lowest level. Check that the risk mitigation plans are sufficient, risk handling measures planned, funded, executed and completed at the right time. NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B