4.5.7 - Hosted Payload

4.5.7-10 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.5.7-10-1 Ensure Worst Case Circuit Analyses is performed on the electrical interfaces to ensure that all interface types will remain within specification throughout mission life Phase B | Phase C | Phase D1 | Ensure analyses cover all payloads, all non-nominal environmental cases (e.g. solar flares), and Host end-of-life conditions. NA NA TOR-2014-02199, Guidelines for Hosted Payload Integration
4.5.7-10-2 Ensure mating of wrong connectors together is prevented by utilizing variations in connector type, keying features, and color coding on the Hosted Payload Phase B | Phase C | Phase D1 | Ensure use of unique connector ID markings as much as possible on units and harnesses. NA NA TOR-2014-02199, Guidelines for Hosted Payload Integration